Laserfiche WebLink
Release (leak) Evaluation <br /> ALL V"U VARIATION UCU <br /> The transfer of hazardous substances Into and out of the underground storage <br /> tank may continue during implementation of the steps provided the steps are <br /> Volume Caia Velwe I,o®• completed within the specified time periods and any 1 or gain did not <br /> exceed two times the specified levels. Daily reconciliation Mall continue <br /> during implementation of the steps. <br /> •here inventory reconciliation indicated an increase In product. steps <br /> Review Recons• within — Revlon Records 1.2.3.4.and 6 shall be completed. Vhere inventory reconciliation indicates a <br /> decrease in product. steps 1.2.3.4.S.6.7.9. and 9 shall be completed. <br /> The required steps include: <br /> VOrters w wig perform Step 1 - Mithin 2 Nouns the operator shall review the inventory records <br /> Reconciliation Raeeseiliatian to determine of an error exists. <br /> =.L <br /> Step 2 - Mithin 24 Hours a now inventory reconciliation shall be <br /> Performed. <br /> MotiEy Tawk r Net{ty Tank r <br /> Step 3 - Mithin 24 Hours the operator shall notify the owner verbally or <br /> Within '�'� In writing that inventory variations were exceeded. <br /> qualified Person to <br /> titled from <br /> m <br /> Review Record Review Record <br /> Step 4 - Rithin 24 Haus the operator shall have performed by a <br /> d <br /> Lost Static Situation qualified person. a complete review of all inventory records <br /> from the last time a stable situation existed. <br /> Wilma Physicality [aspect Step S - Yithtn 2 D3iy,R the readily accessible physical facilities shall <br /> Facility Eor be carefully inspected for leaks by trained personnel. <br /> Step 6 - Ritbin 3 Dart all dispenser meters shall be checked for proper <br /> calibration. <br /> eh Calibration 'Yi Mi it Calibration Step 7 - Mithin 4 Dari all piping shall be isolated and hydrostatically <br /> om Dispenser Meters 3� ' w Dispenser Maters tested. if excavation is necessary to isolate piping, this <br /> 1 <br /> step need not be completed. <br /> Within Rydrostatie pleasure Step R - Rithin S Dart the underground storage tank Mall be precision <br /> 6 Days Test an piping tested. <br /> Step 9 - Nlthin all additional tests or investigations as <br /> required'by6110M County Environmental Health shall be <br /> ®Stems may be implemented in sequence ptrEae® Taad< Test <br /> or at the ease time. however they mat <br /> be completed within the time from within Refer to the Release (leak) Evaluation Action Chart and Check List. The Check <br /> specified. s List shall be completed for each allowable variation which is exceeded and <br /> 7ifthen attached to the Inventory Reconciliation Sheet. (See Appendix 12i and <br /> 12) for example of the Release (leak) Evaluation Chart and Check List.) <br /> .y <br />