My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 9:09:44 AM
Creation date
6/23/2020 6:40:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Release (leak) Evaluation <br /> ALL V"U VARIATION UCU <br /> The transfer of hazardous substances Into and out of the underground storage <br /> tank may continue during implementation of the steps provided the steps are <br /> Volume Caia Velwe I,o®• completed within the specified time periods and any 1 or gain did not <br /> exceed two times the specified levels. Daily reconciliation Mall continue <br /> during implementation of the steps. <br /> •here inventory reconciliation indicated an increase In product. steps <br /> Review Recons• within — Revlon Records 1.2.3.4.and 6 shall be completed. Vhere inventory reconciliation indicates a <br /> decrease in product. steps 1.2.3.4.S.6.7.9. and 9 shall be completed. <br /> The required steps include: <br /> VOrters w wig perform Step 1 - Mithin 2 Nouns the operator shall review the inventory records <br /> Reconciliation Raeeseiliatian to determine of an error exists. <br /> =.L <br /> Step 2 - Mithin 24 Hours a now inventory reconciliation shall be <br /> Performed. <br /> MotiEy Tawk r Net{ty Tank r <br /> Step 3 - Mithin 24 Hours the operator shall notify the owner verbally or <br /> Within '�'� In writing that inventory variations were exceeded. <br /> qualified Person to <br /> titled from <br /> m <br /> Review Record Review Record <br /> Step 4 - Rithin 24 Haus the operator shall have performed by a <br /> d <br /> Lost Static Situation qualified person. a complete review of all inventory records <br /> from the last time a stable situation existed. <br /> Wilma Physicality [aspect Step S - Yithtn 2 D3iy,R the readily accessible physical facilities shall <br /> Facility Eor be carefully inspected for leaks by trained personnel. <br /> Step 6 - Ritbin 3 Dart all dispenser meters shall be checked for proper <br /> calibration. <br /> eh Calibration 'Yi Mi it Calibration Step 7 - Mithin 4 Dari all piping shall be isolated and hydrostatically <br /> om Dispenser Meters 3� ' w Dispenser Maters tested. if excavation is necessary to isolate piping, this <br /> 1 <br /> step need not be completed. <br /> Within Rydrostatie pleasure Step R - Rithin S Dart the underground storage tank Mall be precision <br /> 6 Days Test an piping tested. <br /> Step 9 - Nlthin all additional tests or investigations as <br /> required'by6110M County Environmental Health shall be <br /> ®Stems may be implemented in sequence ptrEae® Taad< Test <br /> or at the ease time. however they mat <br /> be completed within the time from within Refer to the Release (leak) Evaluation Action Chart and Check List. The Check <br /> specified. s List shall be completed for each allowable variation which is exceeded and <br /> 7ifthen attached to the Inventory Reconciliation Sheet. (See Appendix 12i and <br /> 12) for example of the Release (leak) Evaluation Chart and Check List.) <br /> .y <br />
The URL can be used to link to this page
Your browser does not support the video tag.