My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 9:09:44 AM
Creation date
6/23/2020 6:40:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> I. WRITTEN MONITORING PROCEDURES <br /> 1. Site Name: 7-Eleven Facility No. 20632 <br /> 2. Site Address: 4627 Davinci Drive, Stockton, CA 95207 <br /> 3. Describe the freauencv of performing the monitoring method. <br /> All Southland tanks,both single-wall and double-wall,are equipped with automatic tank gauges <br /> (ATGs). The ATGs monitor the system constantly and test the tanks monthly to obtain a valid <br /> monthly test(tank capacity between 50-90%full,4-hour wait time between deliveries and 6-hour <br /> test time). The piping systems(single-wall and double-wall)are monitored constantly by <br /> mechanical pressure gauges. Additionally, all Southland piping systems receive line tightness tests <br /> annually. <br /> 4. What method and equipment will be used for performing the monitoring? <br /> Quantitative monitoring will be used at all Southland sites. The ATGs test both types of tanks <br /> monthly. The ATG system used by the Southland Corporation is the TIDEL EMS. The piping <br /> systems are tested annually with line tightness tests and are constantly monitored with Red Jackets or <br /> Vaporless LD 2000 which will shut off the piping if the pressure drops too low. <br /> 5. Describe the location(s)where the monitoring will be performed. <br /> The Red Jackets or Vaporless LD 2000 are located in the turbin pit. The ATGs are located in the <br /> tanks. <br /> 6. List the names of the persons responsible for performing the monitoring and/or maintaining the <br /> equipment. <br /> The individual(s)responsible for monitoring the equipment is/are the store operator(s). The store <br /> operator(s)for this store is/are Mani it&Gurpal Grewal The Southland Corporation is <br /> responsible for maintaining the equipment. <br /> 7. Reporting format: The TIDEL EMS unit keeps the results of leak tests in memory for 12 months. <br /> This information can be printed by following the instructions on the unit. <br /> 8. State the preventive maintenance schedule for the monitoring equipment, Note: The maintenance <br /> schedule shall be in accordance with the manufacturer's instructions. <br /> Equipment repairs and replacement will be performed as needed. Additionally, in accordance with <br /> the manufacturer's instructions,the monitoring equipment will be tested annually to certify that it is <br /> functioning properly. <br /> 9. Describe the training needed for the operation of both the tank system and the monitoring equipment. <br /> Training is provided for new employees. Training refreshers are offered as needed. The operations <br /> manual for the equipment was provided to the store operator when the equipment was installed. <br /> Training also includes emergency procedures and spill clean-up. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.