Laserfiche WebLink
H. WRITTEN RESPONSE PLAN <br /> 10. If an unauthorized release occurs how will the hazardous substance be cleaned un? <br /> In the state of California, if a tank leaks and the "operator is able to cleanup the release with 8 hours <br /> after the release was detected or should reasonably been detected, and which does not escape from <br /> the secondary containment,does not increase the hazard of fire or explosion and does not cause <br /> deterioration of the secondary containment of the underground storage tank, shall be recorded on the <br /> operator's monitoring reports." Thus, in this situation,the operator should make a record of the spill <br /> and maintain this record with the gasoline files at the facility. However,this situation does not <br /> require reporting to the local agency. However,all other unauthorized releases must be reported to <br /> the local agency within 24-hours. The next action would be to evacuate the primary vessel and then <br /> the secondary vessel. The tank would then be replaced and/or repaired. Any leaking pipes will be <br /> treated in the same manner. If an unauthorized release occurs from a single-wall tank and/or piping <br /> system,the same protocol should be followed. Southland would then begin any assessment and/or <br /> cleanup activities directed by the local agency. <br /> 11. List the proposed methods and equipment to be used for removing and properly disposing of any <br /> hazardous substances. Include the location and availability of the required equipment if not <br /> permanently on-site and an equipment maintenance schedule for the equipment located on site. <br /> All Southland facilities have absorbent material on site to be used for very small spills. Once used, <br /> this absorbent material is collected by a contractor and disposed as oily waste. If a larger spill <br /> occurs,Environmental Health Services will be notified. Fluor Daniel GTI, Southland's <br /> environmental consultant for the greater Los Angeles Area and Northern California Area, may also <br /> be notified. Fluor Daniel GTI will then proceed to clean up the spill(or perform whatever tasks <br /> necessary, such as a site assessment)in accordance with SA/M manual guidelines. <br /> 12. List the name(s)and title(s)of the person(s)responsible for authorizing any work necessary under <br /> the response plan. <br /> The environmental coordinator for the Southland Corporation, Western Region, is Bob DeNinno. <br /> All necessary work and coordination with contractors will be authorized by his office. Fluor Daniel <br /> may also be contacted. <br /> 2 <br />