Laserfiche WebLink
UST Removal Work Plan <br /> 7-Eleven Store No. 20632,Stockton,CA May 12,1998 <br /> • Upon receipt of analytical results, and approval from SJCEHD Inspector, backfill <br /> and compact excavation in accordance with all appropriate local requirements. <br /> • UST closure report outlining field activities, findings, and conclusions shall be <br /> prepared by Fluor Daniel GTI (see Fluor Daniel GTI Work Plan). <br /> 4.0 LABORATORY ANALYSIS <br /> Soil samples will be maintained, prepared and analyzed according to Test Methods for <br /> Evaluating Solid Waste, (SW-846), Third Edition, Update #2, November 1990. The <br /> laboratory analyses will be performed by a laboratory that is certified by the California <br /> Department of Health Services. <br /> Soil sample collections and analysis to be conducted by Fluor Daniel GTI per SJCEHD <br /> requirements (see Fluor Daniel GTI Work Plan). <br /> 5.0 REPORT <br /> Upon completion of the field work and receipt of laboratory analyses, Fluor Daniel GTI <br /> will prepare and submit a UST closure report per SJCEHD requirements (see Fluor <br /> Daniel GTI Work Plan). <br /> Maness appreciates the opportunity to provide environmental management services for <br /> the Southland Corporation. If you have any questions regarding the work plan or require <br /> additional information,please call us at(562) 595-4555. <br /> Sincerely, <br /> M ss�0 oration <br /> 0 <br /> ° Cyril Yong <br /> Engineer <br /> 2 <br />