Laserfiche WebLink
hlb jnmj Says & Waig— <br />Diameter <br />Capacity <br />Length <br />Weight <br />36" <br />150 <br />2'-10" <br />184 <br />36" <br />285 <br />5'-4" <br />287 <br />48" <br />550 <br />6'0" <br />555 <br />48" <br />1000 <br />10'-9" <br />1,385 <br />64" <br />1000 <br />6'-0" <br />1,263 <br />64" <br />1500 <br />9'-0" <br />1,679 <br />64" <br />2000 <br />12'-0" <br />2,101 <br />64" <br />3000 <br />18'-0" <br />2,936 <br />64" <br />4000 <br />24'-0" <br />3,747 <br />76" <br />2000 <br />9'-0" <br />2,198 <br />76" <br />3000 <br />13'-4" <br />3,245 <br />Diameter <br />Capacity <br />Length <br />'Weight <br />76" <br />4000 <br />16'-10" <br />3689 <br />76" <br />5000 <br />22'-2" <br />5,012 <br />96" <br />5000 <br />14'-0" <br />5,056 <br />96" <br />6000 <br />16'-1" <br />5,633 <br />96" <br />8000 <br />21'-4" <br />7,061 <br />96" <br />10000 <br />27'-0" <br />8,603 <br />96" <br />12000 <br />32'-0" <br />9,941 <br />120" <br />10000 <br />17'-2" <br />7,722 <br />120" <br />12000 <br />20'-6" <br />8,846 <br />120" <br />15000 <br />25'-8" <br />13,079 <br />120" <br />20000 <br />34'-1" <br />16,560 <br />Guide Specifications—Jacketed Steel Underground Storage Tanks <br />Short Form <br />The contractor shall provide a Jacketed Steel Underground Storage <br />tank consisting of structural innerwall and a semi-rigid outerwall, as <br />shown on drawings. The primary vessel shall be a U.L labeled, steel <br />underground storage tank and the secondary containment vessel shall <br />be a Tank Jacket, as manufactured by Total Containment, Inc. <br />Tanks shall be tested and installed in accordance with the manufac- <br />turers published installation instructions and only approved bedding <br />and backfill material may be used. <br />Long Foram <br />Construction <br />Primary Storage Vessel: Shall be a steel underground storage tank, <br />all welded construction in accordance with the requirements of UL -58 <br />and tested and labeled accordingly. <br />Secondary Containment Vessel: At the factory, a 2 psi air pressure <br />and soap test shall be performed to detect any pinhole leaks. An air <br />pressure soap test, not more than 1 psi, shall be performed at the job - <br />site, before installation. After installation, before backfilling to grade, an <br />air pressure hold test shall be performed no greater than 2 psi. <br />Integrity Testing <br />Primary Storage Vessel: At the factory, a 5 psi air pressure and soap <br />test shall be performed to detect any pinhole leaks. If required, a 5 psi <br />air pressure hold test may be performed after installation before <br />backfilling to grade. <br />Secondary Containment Vessel: At the factory, a 2 psi air pressure <br />and soap test shall be performed to detect any pinhole leaks. An air <br />pressure soap test, not more than 1 psi, shall be performed at the job - <br />site, before installation. After installation, before backfilling to grade, an <br />air pressure hold test shall be performed no greater than 2 psi. <br />Licensed Manufacturer: <br />Construction Materials <br />Primary Storage Vessel: Shall be a prime grade steel as required by <br />U.L, ASME, API, N.F.P.A. 30 and U.F.C. <br />Secondary Containment Vessel: Shall be fabricated of a high density <br />polyethelene, 100 mils in thickness. <br />Product Compatibility <br />Both the primary storage vessel and the secondary containment vessel <br />shall be compatible with gasoline, gasohol, ethanol, methanol, jet fuel, <br />av-gas, kerosene, diesel fuel, motor oil at ambiant underground <br />temperatures; or used for fuel oil not to exceed 150°F. <br />Interstitial Fluid Migration <br />There shall be an interstitial space between the primary storage. vessel <br />and secondary containment vessel created by high density <br />polyethelene stand-off mesh with a highilow profile to allow 100% fluid <br />migration, under maximum loads, between the walls. <br />Corrosion Protection <br />The primary storage vessel (steel) shall provide striker plates under <br />each fitting to eliminate internal impact corrosion. The secondary con- <br />tainment vessel shall totally isolate the primary storage vessels from <br />stray electrical currents as well as the environment. A sufficient quan- <br />tity of hydrated lime shall be inserted within the interstitial space so as <br />to raise the ph level to above 10. <br />Monitoring Access <br />The secondary containment vessel shall provide a monitoring access <br />fitting for insertion of a continuous monitoring probe. This fitting shall <br />be located at the lower end of the sloped tank. <br />5�sx:i:,:, -'a..i..:!.7%n,}"+'„."t.'w'A�=zPr�:xzrs.^.wktr_a..s.o�.,.,�e+=-'�.+-a' a. ',wsti.✓". <br />