My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_1998-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 9:51:39 AM
Creation date
6/23/2020 6:40:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2002
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_1998-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: 671b 7 98 • • <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permit holder must notify (the local agency_ within 30 days of <br />any changes to the monitoring procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR <br />Facility Name cm pts 7- Ele-,HA 114of <br />Facility <br />n <br />W <br />Describe the frequency of perfomfing the monitoring:0 8 1998 <br />What sr • • •- l-• r • -Z—C -b-'e-u—se'-d'.'f'o.-r/-'p'erfom3ing the <br />s • <br />r % rQ <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan should be <br />attached): <br />6te. a. e -h .5t4f DCaA and hank diekd -);'i �. <br />0 <br />List the name(s) and title(s) of the people responsible for performing the monitoring and/or <br />maintaining the equipment. <br />E. Reporting Format for <br />a <br />F. Describe the preventative maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule but <br />not less than every 12 months. f �nnua I <br />G. Describe the training necessary for the operation of UST system, including piping, and the <br />monitoring equipment:' n 5 -We EAWP-tA (i I r ° ljeda ► � n I " rwink4led <br />4-19 V46?1;W, ft11W, <br />z is 4 ank and Lj'o n <br />1stTietfiw Olnyentp- Ree6AC� <br />9) �"viz aM maiA+erwrd Re= <br />
The URL can be used to link to this page
Your browser does not support the video tag.