Laserfiche WebLink
JUL-03-2002 14:35 SOUTHLAND CORP NW DIV. 503 97? 7?11 P.08/16 <br /> WZA MONiTOLUNG AND RESPONSE PLAN • <br /> UNDERGROUND STORAGE TANK MUNrFUMG PROGRAM <br /> This n�anitoria.Grogram miler be kept uthe Li.ST inraricm id ail 6uies,The iaformaboa on thi6 monlwring prugratn air <br /> - <br /> This <br /> of the operating permit Thr pcxmit holder moot notify 8avtrontnenmi Health nepartmmit.(209)468.3420 within 3u <br /> days of any ehenarn in the uiuriitorintt Pmccduros,unlet•"required to obtain V1ppu0vnl nr a parmit bcfaro MakinA the change. <br /> Requhv4 by rnR 2632(d)and 2641(h). VATS 3/21/2002 <br /> FACTLTIT NAME 7-Eleven#20632 <br /> FAGTi,Ti'Y ADDRESS 41427 DaVinci,Slucklwi,CA <br /> I,Nome(s)and Tit(e(s)of the people responsible for performing the monitoring andloir ntaintcaance <br /> The store operator is respinisihle for portorming the monitoring. <br /> Sacramento iviuitdonancc and Equipment performs the maintenance on thr.equipment <br /> 2.Describc the frequency of performing the monitoring for: <br /> TANKS Continuous interstitial monitoring PIPING Continuous SUMP monitoring <br /> 3.Describc the location(s)of where the monitoring will be performed.ie:locorlon exemors <br /> The interstitial sensors for the tanks arc located in the interstitittl spaces at the end of each tank. The piping <br /> sensors arc located in each tank's turbine sump. <br /> 4,Descri&the following equipment fur Nix it w►dergrrnotd storage lr nk. <br /> Name turd Model of Monitoring Ponel VeederRuot TLS350 <br /> Name and Model of Line Leuk Detectors Vaporless i D2000 <br /> Name and Model of Annulw 3eitsors VtwderRont 094390.420 _ <br /> Name and Model of Piping Srnsnri VW-WerRtyot#794380.352 _ <br /> Name and Model of nispewiar Scasom VeklerRnrrt 8704380-208 <br /> Type of overfill prevant)[a' 13nu:n wicaton 61 SU <br /> S.Do the Turbuic S imus And Mspanmor Pott 5ensorg shut down the turbine-0 Yra® No rl <br /> Does the turbinr..1mi ticiwn if a sensor is disoonneded? Yea® No❑ <br /> Does the turbiirc bi)tut down in tho monitoring panel loses pouter? W*19 Non <br /> 6.How will the alauu Ilisnry and subsequent matntenance be recorded? <br /> The alarm history will br.-.?tared in the Veedcrltoot TO&Gauge and available via pi intnut. <br /> Maintenance records will be rriiotdraf on an equipment maintenance log and stored at ihr.a(Ic. <br /> 7.Maintenance of the monitur(r%ryuipmcnt must be performed at least once every 12 monlhx. <br /> Describe the preventive nteintrnrintx schedule and recording for the monitoring equipruMit.'What month will <br /> annual monitoring certiftcatiun 13C performed in? _Maintenance and repair of the equipmrnt it ltiorformod U <br /> needed, The VoodcrRoot TT.S350 is ccrtif ed in the month of June. <br /> Nate:For naw immuituonr the sernndwy conraiamrnl mrdl be tcrnd 6 nionlhi gfter Uulnllaiion,All secondary contnramenl,rynlenH nism he <br /> lewtod wive every 36 mondw with initial teatingprrformed before becembsr3l,200- <br /> 8.Describe the training necessary for tho uperation of UST system.including piping,and the monitoring <br /> equipment. Training is pnovidod for new employees. Training reftshtm, are offered as needed. The operations <br /> manual for the equipment was provided to the store operator when the cquipmeut was installed. <br />