My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' r <br /> D. Results of Testing/Servicing Oq 17 1 <br /> Software Version Installed: 1 <br /> Co p ete the following checklist: <br /> /-Yes _t No" Is the audible alarm operational? <br /> s , Pio' Is the visual alarm operational? <br /> i <br /> /Yes _i Pio" Were all sensors visually Inspected,functionally losied,aim confirmed operational? <br /> es a Pao' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> oper operation? <br /> 7 Pio' It alarms are relayed to a remote monitoring station;is all communications equipment(e.g.modem)operational? <br /> NIA <br /> Yes D No" Forpriissurized piping systems/does the turbine automatically shut down if the piping secondary containment monitoring system <br /> E NIA d9Kc1s a leak,fails to opera r is electrically disconnected? if yes:which sensors initiate positive shut-down? (Check all that apply) <br /> SumpiTrench Sensor! 0 Dispenser Containment Sensors, Did you confirm positive shut-down dire to leaks and sensor <br /> t failureldisconnection? 5 Yes; LI No. <br /> Yes s o` For tank systems thai utilize Fhe monitoring systom as the pnmarq tank overfill warning device(i.e.no mechanical overfill prevention <br /> fA valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? if so,at what percent <br /> of tank capacity-does the alarm tri er? yo <br /> Yes' o Was any, monitoring equipment replaced? if yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> S No Was liquid found Inside any secondary containment systems designed as dry systems? (Check all that apply)t i Product; D Water. If <br /> "I ys,describe causes in Section E below. <br /> as No' Was monitoring system setup reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes No' is all-monitoring equipment operational per manufacturer's specIlications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 12x07 <br /> 2 2/21107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.