Laserfiche WebLink
' r <br /> D. Results of Testing/Servicing Oq 17 1 <br /> Software Version Installed: 1 <br /> Co p ete the following checklist: <br /> /-Yes _t No" Is the audible alarm operational? <br /> s , Pio' Is the visual alarm operational? <br /> i <br /> /Yes _i Pio" Were all sensors visually Inspected,functionally losied,aim confirmed operational? <br /> es a Pao' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> oper operation? <br /> 7 Pio' It alarms are relayed to a remote monitoring station;is all communications equipment(e.g.modem)operational? <br /> NIA <br /> Yes D No" Forpriissurized piping systems/does the turbine automatically shut down if the piping secondary containment monitoring system <br /> E NIA d9Kc1s a leak,fails to opera r is electrically disconnected? if yes:which sensors initiate positive shut-down? (Check all that apply) <br /> SumpiTrench Sensor! 0 Dispenser Containment Sensors, Did you confirm positive shut-down dire to leaks and sensor <br /> t failureldisconnection? 5 Yes; LI No. <br /> Yes s o` For tank systems thai utilize Fhe monitoring systom as the pnmarq tank overfill warning device(i.e.no mechanical overfill prevention <br /> fA valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? if so,at what percent <br /> of tank capacity-does the alarm tri er? yo <br /> Yes' o Was any, monitoring equipment replaced? if yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> S No Was liquid found Inside any secondary containment systems designed as dry systems? (Check all that apply)t i Product; D Water. If <br /> "I ys,describe causes in Section E below. <br /> as No' Was monitoring system setup reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes No' is all-monitoring equipment operational per manufacturer's specIlications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 12x07 <br /> 2 2/21107 <br />