Laserfiche WebLink
1 0 0 <br /> F. In-Tank Gauging/SIR Equipment: �./Chpck this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment Is installed. <br /> This section must be completed If in-tank gauging equipment Is used 10 perform leak detection monitoring, <br /> Complete the following c ocklist: <br /> Yes No' Has all input wiring been Inspected for proper entry and termination,including testing for ground faults? <br /> Yes U No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes No' Was accuracy of system product level readings tested? <br /> Yes C No' Was accuracy of system water level readings tested? <br /> Yes No' Were all probes reinstalled properly? <br /> Yes , No` Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): 71 Check this box it LLDs are not installed. <br /> Co lete the following checklist: <br /> 7,-Yes 0 No' dor equipment start-up or annual equipment certification,was a leak simulated to verity LLD performance?(Check all <br /> 0 NIA that apply) Simulated leak rate-, []3 g.p.h.; 11 O,I g,p.h; H 0,2 g.p.h. <br /> Ye 0-- Were aft LLDs confirmed operationai and accurate <br /> es C Was the testing apparatus properly calibrated? <br /> Yes0 For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Yes 0. For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> NIA <br /> Yes fl o For electronic LLIne automatically shut off if any portion <br /> 5s, does the turb of the monitoring system Is disabled or <br /> fN 1A <br /> K <br /> X N/A disconnected? <br /> Yes 10,AW For electronic LLDs,does the turbine automatically shut off it any portion of the monitoring system malfunctions or <br /> j15 >IA fails a test? <br /> No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 24 1 K N/A <br /> Yes n No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br />