My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i r <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES N NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Scope of Work: (Amended*) <br /> Remove and replace the existing RUL and PUL direct-bury spill <br /> containers that failed recent testing. <br /> • Sawcut, remove and dispose of the concrete at each of two (2) <br /> spill containers. <br /> • Remove and dispose of the existing spill containers. <br /> • Install all Source NA furnished OPW spill containers, swivel <br /> adapters, caps, face seal adapters and jack screw kits. <br /> • Obtain the required CUPA inspection prior to backfill. <br /> • Backfill and restore all concrete removed for this work. <br /> • Obtain all CUPA inspections and provide all COPA and Air Quality <br /> testing. <br /> *Replace drop-tube inside 87 & 91 tanks. <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> (2) OPW-1 C-2100C-DEVR 5-gallon spill <br /> containers. <br /> (2) OPW-61 SALP-1020-EVR OPW 4" swivel fill <br /> adapters. <br /> (2) OPW-634TT-7085-EVR OPW 4" fill caps. <br /> (2) OPW 61 JSK-44CB Jack screw kit . <br /> (2) FSA-400S OPW face seal adapters. RECEWE <br /> (2) 71 SO-410C 4" OPW Overfill Prevention Valve W,y y :; &013 <br /> EPP4 RGNAAF-N 4I�— <br /> EH230038(revised 7-26-2016) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.