Laserfiche WebLink
Scope of Work: (Amended)* Legend <br /> Remove and replace the existing RUL and PUL direct- Open Parking Lot I O Gasoline-87 <br /> bury spill containers • Gasoline-89 <br /> • Sawcut, remove and dispose of the concrete at each of • Gasoline-91 <br /> two (2) spill containers. 0 Diesel <br /> • Remove and dispose of the existing spill containers. O Annular <br /> • Install all Source NA furnished OPW spill containers, . Submersible Turbine Pump <br /> swivel adapters, caps, face seal adapters and jack screw •v TLM Probe <br /> kits. Monitoring System Panel <br /> l i.-1—I B Emergency Shut-Off Switch <br /> • Obtain the required CUPA inspection prior to backfill. > Q Overfill Alarm <br /> • Backfill and restore all concrete removed for this work. Q Float&Chain <br /> • Obtain all CUPA inspections and provide all CUPA and 4 Q ■ Sump/UDC Sensor <br /> Air Quality testing. w^ 016 ♦ Interstitial Sensor <br /> q) 0 Vacuum Sensor <br /> Replace Drop tube inside 87 & 91 tanks.* o o Line Leak Detector <br /> 0 ISD Flow Meter <br /> or C� 0 ISD Pressure Sensor <br /> O <br /> mv, OO Spill Containment Kit <br /> 0 w <br /> IX <br /> c <br /> 0 <br /> N .N <br /> • a <br /> U K� <br /> Q � Cn <br /> O <br /> -. I— <br /> Q o2 <br /> Z 3 �b <br /> fa T <br /> CAS <br /> O d <br /> O O .p' OO <br /> � 71, <br /> C14XM0_ C7 <br /> fri (0 <br /> j Lu N c <br /> 0 <br /> Y <br /> C-4 O <br /> ® � fn <br /> �Wll 1II.. .Ii IO" 10110 ltk` ;� li = m -----. __. <br />