My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work: (Amended)* Legend <br /> Remove and replace the existing RUL and PUL direct- Open Parking Lot I O Gasoline-87 <br /> bury spill containers • Gasoline-89 <br /> • Sawcut, remove and dispose of the concrete at each of • Gasoline-91 <br /> two (2) spill containers. 0 Diesel <br /> • Remove and dispose of the existing spill containers. O Annular <br /> • Install all Source NA furnished OPW spill containers, . Submersible Turbine Pump <br /> swivel adapters, caps, face seal adapters and jack screw •v TLM Probe <br /> kits. Monitoring System Panel <br /> l i.-1—I B Emergency Shut-Off Switch <br /> • Obtain the required CUPA inspection prior to backfill. > Q Overfill Alarm <br /> • Backfill and restore all concrete removed for this work. Q Float&Chain <br /> • Obtain all CUPA inspections and provide all CUPA and 4 Q ■ Sump/UDC Sensor <br /> Air Quality testing. w^ 016 ♦ Interstitial Sensor <br /> q) 0 Vacuum Sensor <br /> Replace Drop tube inside 87 & 91 tanks.* o o Line Leak Detector <br /> 0 ISD Flow Meter <br /> or C� 0 ISD Pressure Sensor <br /> O <br /> mv, OO Spill Containment Kit <br /> 0 w <br /> IX <br /> c <br /> 0 <br /> N .N <br /> • a <br /> U K� <br /> Q � Cn <br /> O <br /> -. I— <br /> Q o2 <br /> Z 3 �b <br /> fa T <br /> CAS <br /> O d <br /> O O .p' OO <br /> � 71, <br /> C14XM0_ C7 <br /> fri (0 <br /> j Lu N c <br /> 0 <br /> Y <br /> C-4 O <br /> ® � fn <br /> �Wll 1II.. .Ii IO" 10110 ltk` ;� li = m -----. __. <br />
The URL can be used to link to this page
Your browser does not support the video tag.