My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> MORE <br /> ' II 1 <br /> EM11M <br /> M-14- <br /> STEP7 .Apply a bead of Blue Bond 801 around the housing threads �`• `a, <br /> and thread the repair boot onto the housing. <br /> STEP 8 Index the repair boot with the fill tube at the 12:00 position. <br /> OR <br /> NOW <br /> STEP 9 Install the split insert around the pipe and apply a liberal ` <br /> i. � . .,. ' <br /> bead of Blue Seal Glue along the seam and lightly hold or f, <br /> clamp until cured. •'j'+ ;'; . ' ':.; <br /> �%•""'v�`��':;ems.i�y�.1. <br /> =- <br /> STEP 10 Install the insert into the repair boot. <br /> STEP 11 Install the rear clamp and tighten to 65 inch lbs. (Be careful <br /> not to do this until the Blue Bond 801 is cured.) Install the ;•,.;;_, �r;,: _ <br /> outer clamp loosely so that air can escape between the insert <br /> and the boot while the boot is being filled with Bostik sealant. <br /> Fill the entire boot cavity with Bostic: 1100FS sealant. As the <br /> boot fills it will begin to pressurize and push the insert <br /> ourivard. <br /> STEP 12 Tigliten the outer clamp to 65 inch lbs. Clean up any excess <br /> sealant and allow 24-48 hours for Bostik 110OFS sealant to <br /> fully cure. <br /> li(1.fps <br /> MV NO= <br /> NEW <br />
The URL can be used to link to this page
Your browser does not support the video tag.