Laserfiche WebLink
File MH28727 Vol . 1 Sec. 1 <br /> ILL-1 Issued: 2004-01-05 <br /> And Report Revised: 2006-10-04 <br /> BOOM EM <br /> STEP 1 Drill a hole in the sump wall large enough for the pipe �_ '""• <br /> to pass through. <br /> STEP 2 Using one of the poly rings as a guide,mark and drill <br /> the bolt hole pattern in the sump with a'/.^drill bit. <br /> STEP3 Apply a liberal bead of sealant to the bottom of both y <br /> the interior and exterior gasket. This ensures a seal (• �\ <br /> around all the bolt holes. I` <br /> STEP4 Align both interior and exterior poly rings with the <br /> j5 <br /> gaskets and install bolts and nuts. z—ij49 <br /> y <br /> STEP 5 Working in a star pattern,tighten all nuts to 45 Inch <br /> lbs or until snug. <br /> STEP 6 install Interior and exterior boots onto Interior and <br /> exterior gasket rings. Tighten the large dimension <br /> clamp to 45 inch lbs to secure the boot to the gasket <br /> ring. :y <br /> STEP 7 Install pipe to the desired position and tighten both <br /> clamps to 65 Inch lbs or until tight. <br /> a a 21 <br /> ...® 9 ,. ... <br /> 0060438297 <br />