My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File MH28727 Vol. 1 Sec. 1 ILL-lA(Page 1) Issued: 2004-01-05 <br /> And Report <br /> ti7'EP 1 Identify the damaged hoot and select the proper Blueline Repair <br /> Boni britt!upon the ntunber of studs and the pipe Ol).(See 2006 <br /> Catalog,St-conn 10 and Appcndiz I) <br /> i� <br /> t <br /> If P! <br /> IOD <br /> ti!'EI'2 Remove band clamps from ok1 fitting. Remove the nuts from the <br /> cc <br /> stubs and store for future use.Remove.old fitting.The old fitting <br /> will need to be cut off.Take care not at damage the secondary <br /> pipe. Oe <br /> I <br /> STEP Install all Pellethane split components onto the pipe carefully.:!!! <br /> Peifethane pieces must be rebonded back together wide Blue Sea) <br /> Glue,This is done by ensuring that the surfaces are dean and dry. <br /> Apply a liberal bead of Blue Seal and hold the sears closed <br /> securely until It Is fused.It's helpful to use the clamps to loosely <br /> hold the boot closed during wring. Bonded connections should AN. <br /> h44themselves closed within five minutes if there are no stre ses <br /> tm them.The Blue Seal glue will he fully curet!in 40 minutes. <br /> S'l Ell Once all components are bonded,apply a liberal head of AWOR <br /> t <br /> Bostik 118OFS to the underside of the seal. l` <br /> This will make the seal with the sump well. Insert poly ring into <br /> the gasket and position it onto the studs and up against the suatp 1`\ <br /> wall <br /> 1 4D <br /> STEP 5 Reinstai)nuns and tighten theta in a star pattern. <br /> ,:x::::11 <br /> 0060438298 <br />
The URL can be used to link to this page
Your browser does not support the video tag.