My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' File' MY28727 Vol . 1 Sec. 1 ILL-1B(Page 1) Issued: 2004-01-05 <br /> And Report <br /> STEP 1 Identlfy the doniaged boot and select lie proper Blurkite.Repair <br /> Hoot bayed upon the number of studs and the pita.pp-(See 21)06 <br /> ('ata log,Section 10 and Appendix 1) <br /> Silt... <br /> STET 2 Install no Pellethane spin coul"wnts onto the pipe carefully.All <br /> Ptlltthane pieces must be rebonded back togcthtr with[out seal <br /> Glut.This is done by ensuring that the surfaces are clean and dry-. q <br /> Apply a liberal bead of Blue Seal and hold the scant closed <br /> securtly until it!s fused. It's helpful to use the cLtnps to loosely _ <br /> hold the boot closed during coving. Bonded connections should <br /> hold themst4ves closed within five minutes if there are no stresses <br /> on them.The Blue Seal glue wl)l be full•eared in 40 minutes. - <br /> 5['EP3 Once all 111ueline approved coo _ <br /> Iibtral bead of ponrnts are bonded, apply e — <br /> ikrteik 110-OPS to the <br /> underside of the sea!This WW make the.seal with the swap stall. <br /> Insert poly ring into the gasket and position the ring around the <br /> old fitting and against the sump wall. <br /> STE1'a Install tht stif tapping tek scrtA3 through the hi k-4 in the poly <br /> ring and tighten until Mulb(Be carefulIM4 to oder tighten as the ' <br /> Wes can be easily stripped out) ' <br /> �— ra <br /> R <br /> Sl'f P 5 .A'pply a bead of Illue Still Clue along the gasket rim and install <br /> Ow hoot onto the seal. 'natal' hoot with fill tube at the 12:00 <br /> position.Install band clsttrp to secure the boot to the gasket. <br /> MIN <br /> C060438299 <br />
The URL can be used to link to this page
Your browser does not support the video tag.