Laserfiche WebLink
File MH28727 Vol . 1 Sec. 1 <br /> ILL-1B(Page 2) Issued: 2004-01-05 <br /> And Report <br /> ST EP 6 Position the inwrl in to the boot if appmathle,but do not tighten a� <br /> the damp.Thls connectitm must remain loose thn.ugh the Ming <br /> stage to allow air to escape" " <br /> snit 7 F8l the botx with IIIIIIAMP Bosdk 1100FS <br /> through the fill tube with the Bludhte pneumatic dispensing etre <br /> . 1 <br /> until the entire cavity is full. This will ensure that the sesiann <br /> pushes back througlt the leak point and stops the leak <br /> 5'i'l;P 8 Once the both is fufl,tl¢tlrn dwmlm And allow sealant to fulh' <br /> cure.The sealant will gradually continue to cure up inside the <br /> bort and around Ute flange over the nest 2448 hours.However, <br /> You m»y cart hydrostatle tes8ng Imtwediatety as the repair is <br /> com pktr. �. . <br /> jim <br /> t <br /> 0060438299 <br />