My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,3anriary 2002 0 0 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer F-1 Industry Standard X❑ Professional Engineer <br /> Other (Sped) <br /> Test Method Used: FI Pressure F Vacuum Hydrostatic <br /> 0 Other (Specify) <br /> Test Equipment Used: vp1t Equipment Resolution: inches <br /> Sump# 2 PRE Sump# 1 REG Sump# Sump# <br /> Sump Diameter: 4811 48" <br /> Sump Depth: 4911 4911 <br /> Sump Material: hpde hpde <br /> Height from Tank Top to Top of 911 9„ <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 311 3 It <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 11" 11" <br /> Does turbine shut down when <br /> sump sensor detects liquid(bothYes❑NOON Yes❑N�N ❑Yes�N�N Yes allo[:]N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s e c 2-5 s e c <br /> Is system programmed for fail-safe ❑ � ❑ ❑ � ❑ <br /> shutdown?* IflYes N N X Yes N N Yes N N Yes No <br /> Was fail-safe verified to be � ❑ ❑ ❑ � ❑ ❑ L___I�� <br /> operational?* X Yes N N X Yes N N X Yes N N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min <br /> test: <br /> Test Start Time: 10:16 10:05 <br /> Initial Reading(RI): 0 0 <br /> Test End Time: 10:24 10:25 <br /> Final Reading(RF): - .006111 - .0068" <br /> Test Duration: 8min 2 Omin <br /> Change in Reading(R F-RI ): - .006111 -.0068" <br /> Pass/Fail Threshold or Criteria: +-.0021, +-.002" <br /> Was sensor removed for testing? X YesE:]No❑NA R Yes❑No[:]NA OYes❑N NA Yes[:]No <br /> Was sensor properly replaced and � � ❑ � C <br /> verified functional after testing? Ye N NA Ye N NA Ye N NA Yes N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> I If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.