Laserfiche WebLink
11 <br />SWRCB, .I anuary 2002 <br />Page of <br />' Secondaiy containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />4. TANK ANNULAR TESTING <br />Test Method Developed By: <br />❑ Tank Manufacturer rAndustry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure @'Vacuum <br />❑ Other (Spec) <br />❑ Hydrostatic <br />Test Equipment Used: VACUUM <br />Is Tank E:tempt From Testing?' <br />Tank # 97/91 Tank # <br />❑Yes 5'No ❑ Yes ❑ No <br />Equipment Resolution: "hg <br />Tank # Tank # <br />❑ Yes ❑ No ❑ Yes ❑ No <br />Tank Capacity: <br />20K <br />Tank Material: <br />FIBERGLASS <br />Tank Mar ufacturer: <br />WESTERN FIB <br />Product S-tored: <br />FUEL <br />Wait time: between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start: Time: <br />0924 <br />Initial Reeding (Ri): <br />10" <br />Test End Time: <br />1024 <br />Final Reeding (RF): <br />10" <br />Test Dur, -lion: <br />1 HR <br />Change in Reading (RF -RI): <br />0 <br />Pass/Fail Threshold or Criteria: <br />2" <br />Test ReYalt� <br />fti"'Pas§ ❑ Fall ❑ Pass 0 Fail <br />❑ Pass ❑ Fail ❑ Pass ❑ Fair <br />Was sensor removed for testing? <br />VVes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Was senss.)r properly replaced and <br />verified ff mctional after testin ?� <br />❑ No ❑ NA ❑Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' Secondaiy containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />