My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
2300 - Underground Storage Tank Program
>
PR0231083
>
COMPLIANCE INFO_2000-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 3:49:03 PM
Creation date
6/23/2020 6:41:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2011
RECORD_ID
PR0231083
PE
2361
FACILITY_ID
FA0003735
FACILITY_NAME
QUICK N EASY MART
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
01
SITE_LOCATION
2057 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\2057\PR0231083\PERMANENT INJUNCTION & FINAL JUDGMENT 10-19-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page of <br />Test Med, od Developed By: <br />❑ Piping Manufacturer [''Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />k*Pressure <br />❑ Other (Specify) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: NITROGEN <br />Piping Run # 87 <br />Piping Maerial: FIBERGLASS <br />Equipment Resolution: psi <br />In <br />Piping Run # 91 Piping Run # Piping Run # <br />FIBERGLASS <br />Piping Manufacturer: <br />SMITH <br />SMITH <br />Piping Diameter: <br />Y <br />3" <br />Length ol'PipingRun: <br />150' <br />150' <br />Product Stored: <br />FUEL <br />FUEL <br />Method Find location of <br />i -ru:r. isolation: <br />in <br />BOOTED, SUMPS <br />BOOTED SUMPS <br />' <br />Wait timo.; between applying <br />pressure/vacuum/water and <br />starting t;;st• <br />Test Start Time: <br />1127 <br />1127 <br />Initial Reading (Rq): <br />3psi <br />3psi <br />Test End Time: <br />1227 <br />1227 <br />Final Re,,iding (RF): <br />3psi <br />3psi <br />Test Duration: <br />1 hr <br />1 hr <br />Change i;n Reading (FtrRI): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />Test Results ' <br />1t Pass ❑ FaiiPan <br />C] Fail 0pass ' 6Fails C7 Pass C Fail <br />COMMP.ntS — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.