Laserfiche WebLink
. Site Address: 11 l ? :, � _'; 0 "e f'T'esting/Servicing: a /4 `. / <br />F. In -Tank Gauging / SIR Equipment: Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the followine checklist: <br />❑ Yes <br />I ❑ <br />No* <br />I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />' ❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes ❑ <br />No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />�_-..,.....7 .,.,.,,.., ........... ...... I—.. uMat; ucuucelceca were ur wj17 uc correcteu. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the followine checklist: <br />Yes <br />❑ No* <br />For equipment start-up or annual equipmerlt certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: X3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />ty Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ o* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes <br />❑ * <br />For electronic LLDs, does the turbine automatically shut off if any of the monitoring is disabled <br />N/A <br />portion system <br />or disconnected? <br />❑ Yes <br />—❑/No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />,UN/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ o* <br />® N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />___ ____ -___..... __, ... .., ,,,,,, ,,,,,, ,,,,�„ ,ucac ucucecucica wc►r ur weu ue correcteu. <br />H. Comments: <br />