Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www,segov.org/ehd <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br /> Facilit <br /> Name: 24 Hr Gas & Mart/ QuickNSave Address: 1901 S. El Dorado St., Stockton DaectioneNov 21, 2012 <br /> VIOLATIONS <br /> # C1 C2 M Code S2CtiOn HSC=CA Health and Safe Code;CFR=Code of Federal Regulations <br /> C1=Class 1 violation;C2=Class 2 violation;M=Minor violation <br /> " piing(continued) <br /> 702 CCR 2643(e) Biennial tightness test of gravity piping not performed(pre-January 1,1984) (M1) <br /> 703 CCR 2643(d) Triennial line test for conventional suction piping not performed(pre-January 1, 1984) (M1) <br /> WHOUNIONSVINNOW <br /> 999 Other: See attached"Continuation—Official Inspection Report"for violation(s)not listed above. <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> ROUTINE ANNUAL UST INSPECTION **REVISED** <br /> **Inspection report was revised on November 28, 2012. Violation #205 was amended to reflect the <br /> accurate date of May 24, 2011. <br /> **The monitoring system certification, spill bucket testing, and leak detector testing were completed and <br /> witnessed by EHD on August 6 and August 13, 2012. This facility was removed from temporary closure <br /> in August 2012. The paperwork inspection was conducted today. <br /> **The facility changed business owners on October 30, 2012. The property owner and tank owner <br /> remain the same. A new owner consultation was conducted on November 7, 2012. <br /> Class II violations: (108, 109, 110, 111, 201, 202, 205, 206) <br /> 108. Secondary containment testing was performed on August 6 and August 7, 2012. EHD was on site <br /> to witness the August 6 testing. The test report for the August 6 testing was submitted to the EHD on <br /> September 11, 2012. The test report for the August 7 testing was submitted on November 14, 2012, at <br /> the request of the EHD; this report was incomplete. A revised copy of the August 7 test report was <br /> submitted to the EHD on November 20, 2012; the revised report was also incomplete. A copy of the test <br /> report must be submitted within 30 days of the test. Immediately submit a complete and accurate copy <br /> of the August 7, 2012 test report to the EHD. <br /> 109, 110, & 111. Annual monitoring system certification, leak detector testing, and spill container testing <br /> were last performed on May 17, 2011 and was completed on August 6 and August 13, 2012, three <br /> months past due. These tests are required once every 12 months. Take all necessary precautions to <br /> ensure testing is performed in a timely manner. <br /> REPEAT VIOLATION <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Inspector: Received By: Title: <br /> EHD 23-02 4/19/12 Page 3 UST INSPECTION REPORT <br />