My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_1993-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 1:50:57 PM
Creation date
6/23/2020 6:42:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1998
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_1993-1998.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ^- <br /> GENERAL CONSTRUCTION TRIANGLE INC., OF SACRAI 'O HEALTH <br /> SERVICE STATIONS P.O.BOX 9795 SACRAMENTO,CALIFORNIA 95823 352552nd <br /> y�,•�1� <br /> BULK PETROLEUM PLANTS N11 <br /> PETRO•TITE TANK TESTING State License No.183550 <br /> 6-30-93 Phone(9 16)421-1990 Fax 916-421-0642 93 JUL _7 PM 2: 1 O <br /> PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIV. <br /> P 0 BOX 2009 <br /> STOCKTON CA 95201 <br /> ATTN LETITIA BRIGGS, REHS <br /> REF:SITE SAFETY PLAN FOR ARCO FACILITY #2130,7906 N EL DORADO ST,STOCKTON,CA <br /> ITEM#1.FACILITY BACKGROUND WORK PLAN <br /> THIS PROJECT CONSISTS OF REMOVING 2 EACH 4000 GALLON, ONE EACH 6000 GALLON AND ONE <br /> EACH 10,000 GALLON UNDERGROUND GASOLINE SINGLE WALL STORAGE TANKS, AND ASSOCIATED PIPING. <br /> INSTALL 4 EACH 10,000 GALLON DOUBLE WALL FIBERGLASS UNDERGROUND STORAGE -TANKS, UTILIZING <br /> A PORTION OF EXISTING TANK HOLE EXCAVATION. INSTALL NEW DOUBLE WALL FIBERGLASS PIPING <br /> AND LEAK DETECTION MONITOR SYSTEM. THE OBJECTIVE IS IF THERE IS CONTAMINATION AT THIS SITE, <br /> WE WILL BE UNDER THE DIRECTION OF ARCO'S ENVIRONMENTAL, CONSULTING AND MANAGEMENT CO. , <br /> ROUX ASSOCIATES, 1855 GATEWAY BLVD, STE 770, CONCORD, CA. 94520, PHONE 510-602-2333. <br /> THE PERSONNEL REQUIREMENTS IS THAT THOSE WHO ARE INVOLVED WITH THE REMOVAL OF THE UNDERGROUND <br /> TANKS AND PIPING WILL HAVE COMPLETED THE 40 HOUR TRAINING REQUIREMENTS PER IFR. DISPOSITION <br /> OF CONTAMINATED SOIL IF ENCOUNTERED WILL BE UNDER THE DIRECTION OF ARCO'S ENVIRONMENTAL <br /> ENGINEER. CONTAMINATED SOIL IF ENCOUNTERED WILL BE STOCKPILED ON SITE WITH VISQUEEN UNDER <br /> AND OVER. <br /> ITEM#2.KEY PERSONNEL AND RESPONSIBILITIES <br /> PROJECT MANAGER WILL BE NICK CHRONIS, SITE FOREMAN/SITE SAFETY OFFICER WILL BE <br /> DETERMINED WHEN CREW IS AVAILABLE, WHEN PROJECT START DATE IS SCHEDULED. SITE SAFETY <br /> OFFICER/FOREMAN IS RESPONSIBLE FOR IMPLEMENTATION AND ENFORCEMENT OF OUR INJURY AND ILLNESS <br /> PREVENTION PROGRAM. HEALTH AND SAFETY PROBLEMS WILL BE REPORTED TO SITE SAFETY OFFICER/ <br /> FOREMAN WHO HAS THE AUTHORITY TO CORRECT HEALTH AND SAFETY PROBLEMS ON SITE IMMEDIATELY. <br /> INSPECT WORK AREA DAILY TO DETECT UNSAFE WORKING CONDITIONS AND PRACTICES. THE SITE <br /> PHONE NUMBER IS 209-957-2987. PROJECT MANAGER PHONE NUMBER IS 916-421-1990. <br /> ITEM#3. JOB HAZARD ANALYSIS <br /> POTENTIAL HAZARDS TO WORKERS ON SITE:KEEP EXCAVATED TRENCHES AND .TANK HOLES PROPERLY <br /> COVERED AND BARRICADED AS NECESSARY TO PROTECT ALL WORKERS AND INSPECTORS AS NECESSARY. <br /> IF CONTAMINATED SOIL IS ENCOUNTERED CONTACT ARCO'S ENVIRONMENTAL ENGINEER AND PROCEED UNDER <br /> HIS DIRECTION IF HEALTH RISKS ARE INVOLVED TAKE NECESSARY PRECAUTIONS TO USE PROPER <br /> PROTECTIVE EQUIPMENT. HEAT STRESS SYMPTOMS WHICH ARE SHALLOW BREATHING, PALE, COOL, <br /> MOIST SKIN, PROFUSE SWEATING, DIZZINESS, AND LASSITUDE. MONITORING OF HEAT STRESS BY <br /> MEASURING HEART RATE, BODY TEMPERATURE AND BODY WATER LOSS WITH REPLACEMENT OF SALT LOST <br /> IN SWEATING. <br /> ITEM#4. JOB HAZARD SUMMARY. <br /> SUMMARY OF POTENTIAL RISKS FROM THE WORK BEING PERFORMED AT THE SITE ARE NOT AVAILABLE <br /> UNTIL THE EXTENT OF CONTAMINATION IS KNOWN AFTER INITIAL SITE ASSESSMENT. <br /> ITEM #5. EXPOSURE MONITORING PLAN. <br /> IF CONTAMINATED SOIL IS ENCOUNTERED WE HAVE CONTINUOS COMBUSTIBLE HAS INDICATOR TO <br /> PROTECT PERSONNEL ON JOB SITE, THE SURROUNDING AREA IS PROTECTED BY THE VISQUEEN COVER <br /> OVER THE CONTAMINATED SPOIL PILES. HEAT STRESS WILL BE MONITORED AS ADDRESSED IN SECTION 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.