Laserfiche WebLink
PAGE 2 <br /> LETITIA BRIGGS, SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH <br /> NOISE CONTROL WILL BE HANDLED BY THE SITE SAFETY OFFICER/FOREMAN THAT WILL ENFORCE THAT ALL <br /> EMPLOYEES AND INSPECTORS BE ISSUED HEARING PROTECTION DEVICES AND THAT ALL EQUIPMENT IS <br /> MUFFLED. <br /> ITEM #6.PERSONAL PROTECTIVE EQUIPMENT AND ENGINEERING CONTROLS. <br /> FOR REMOVAL OF UNDERGROUND TANKS THE PERSONEL PROTECTIVE CLOTHING IS THE BASIC WORK <br /> CLOTHING WITH SAFETY SHOES, HARD HATS AND GLOVES IF APPLICABLE. RESPIRATORS ARE NORMALLY <br /> NOT REQUIRED BUT ARE AVAILABLE IF NEEDED AND PERSONEL HAS BEEN TRAINED IN THERE USE. THERE <br /> WILL BE NO CONFINED SPACE ENTRIES. <br /> ITEM V. SITE CONTROL. <br /> THE PERIMETER OF THE SITE, WILL HAVE A TEMPORARY 6° HIGH CAHIN LINK FENCE FOR <br /> SECURITY. THE LOCATION OF NEW TANKS AND PIPING ARE SHOWN ON SITE PLAN. <br /> ITEM #8. DECONTAMINATION MEASURES. <br /> RECON PROCEDURES WILL NOT BE REQUIRED DUE TO THE LIMITED AMOUNT OF EXPOSURE TO THE <br /> CONTAMINATED SOIL. <br /> ITEM #9. GENERAL SAFE, WORK PRACTICES. <br /> MOST OF OUR PROJECT IS UNDERGROUND SO WE HAVE INCLUDED A COPY OF OUR EXCAVATION <br /> CODE OF SAFE PRACTICES. THERE WILL BE NO NIGHT WORK. SEE ITEM 9A. <br /> ITEM #10. SANITATION. <br /> THIS FACILITY WILL BE CLOSED SO WORKERS AND INSPECTORS WILL HAVE USE OF THE FACILITY <br /> REST ROOMS. <br /> ITEM #11. STANDARD OPERATING PROCEDURES. <br /> A WEEKLY SAFETY SURVEY HSEET IS ENCLOSED AS ITEM 11A AND IS TO BE USED DAILY IF <br /> FIELD CONDITIONS REQUIRE IT AS DIRECTED BY SAFETY OFFICER/FOREMAN. <br /> ITEM #12. EMERGENCY RESPONSE PLAN. <br /> MEDICAL AND EMERGENCY SERVICES AT ST.JOSEPHS MEDICAL CENTER, PHONE 943-2000, 1800 <br /> NORTH CALIFORNIA STREET, STOCKTON, CA. PHONE IN BUILDING ON SITE WILL BE AVAILABLE AT ALL <br /> TIMES DURING WORKING HOURS. MAP SHOWING ROUTE ON JOB SITE. EVACUATION PLAN IS TO ALL <br /> ASSEMBLE ON NORTH WEST CORNER OF EL DORADO AND HAMMER WITH SAFETY OFFICER/FOREMAN RESPONSIBLE <br /> FOR HEAD COUNT INCLUDING SUBCONTRACTORS AND INSPECTORS. <br /> ITEM #13. TRAINING REQUIREMENTS. <br /> ALL TRIANGLE INC FIELD EMPLOYEES HAVE HAD SPECIAL TRAINING BY THE UNDERGROUND TANK <br /> MANUFACTURERS AND THE UNDERGROUND PIPE MANUFACTURES FOR THE HANDLING OF UNDERGROUND TANKS <br /> AND PIPING. THE HANDLING OF CONTAMINATED SOIL IS UNDER THE DIRECTION OF ARCO°S <br /> ENVIRONMENTAL ENGINEER. <br /> ITEM #14. MEDICAL SURVEILLANCE PROGRAM. <br /> THE SITE SAFETY OFFICER/FOREMAN HAS BEEN MADE AWARE IF ANY EMPLOYEE IS IN NEED OF ANY <br /> SPECIAL SURVEILLANCE AS OF THIS DATE WE HAVE HAD NONE. <br /> ITEM #15. RECORDKEEPING. <br /> COPIES OF ALL RECORDS ARE TURNED INTO OFFICE FROM FIELD WHICH INCLUDES MEDICAL SURVIELLANCE, <br /> TRAINING, RESPITORY PROTECTION, AND INJURIES/ILLNESSES AS REQUIRED BY OSHA. <br />