Laserfiche WebLink
5. IRAEMG <br /> In addition to the training covering subjects mentioned in Sections 3 and 4 above, training <br /> needed for the operation of the tank system and monitoring equipment includes: <br /> How to: <br /> - Take tank level measurements <br /> - Read dispenser meters <br /> - Inspect equipment <br /> - Recognize warning signs: dispenser hesitations, meter spins and odors <br /> - Manually close dispenser impact valve <br /> - Replace dispenser filters <br /> - Shut down the system with and location of: ARCOmatic switch, electrical panel <br /> breakers, and emergency shut off switch <br /> Test the electronic monitor <br /> 6. RECORDS RETENTION <br /> Written records of all monitoring, testing, and maintenance performed shall be maintained <br /> on-site or off-site at a readily available location fora period of at least 5 years. These records must <br /> be made available, upon request within 36 hours, to the local agency or the Board. <br /> 7. PARTY RESEQNSIBLE FOR PERFORMINQ THEM NIT RING <br /> A <br /> Na Title <br /> 8. PARTY RESPONSIBLE FOR MAINTAP41NG EQUIPMENT <br /> Name Title <br />