My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 2:10:05 PM
Creation date
6/23/2020 6:42:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Repairs Clean all bonding surfaces;apply a sive to both bonding surfaces and to <br /> (continued) the cut edge of the hole. Make sure the cut edge of the hole is well coated <br /> with adhesive. <br /> Use 111 maximum diameter holesaw <br /> Coat cut edges with adhesive <br /> • Spread the repair piece and center it over the hole.Secure the repair piece <br /> with two hose clamps,3 inches(75 mm)in from each end,and leave clamps <br /> in place. <br /> • All adhesive must be cured before pressurizing the system. <br /> L— <br /> LLeave hose clamps in place 3"from each end <br /> • This method of repair has not been investigated by Underwriters' <br /> Laboratories.The responsibility for authorization of use of this method of <br /> repair is that of the inspection authority having jurisdiction. <br /> Typical installations Dualoy 3000/11-product/vapor recovery system <br /> Product and vapor lines should include flexible connectors. However,they are <br /> not required when connecting to properly installed tanks or dispensers due to <br /> the flexible nature of Dualoy 3000/1-pipe.A Oft(1200 mm)straight run of <br /> fiberglass pipe is allowable per API 1615. <br /> Dualoy 3000/L piping was used for both primary <br /> and secondary containment lines in this large <br /> fuel handling facility.Seen here is the primary <br /> system during layout. <br /> Ai <br /> r, <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.