My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 2:10:05 PM
Creation date
6/23/2020 6:42:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Typical installations When installing vapor return piping, Main a constant slope from dispenser <br /> (continued) to storage tank. Lines must be free of dips or low spots. Use optional thief port <br /> assembly as required to collect condensed product vapors. <br /> Pressure test entire system before completing backfill operation. <br /> Install vent caps per local code. <br /> Backfill material should be clean washed sand, pea gravel or crushed stone <br /> (max 1/2 inch). Never use native soils. <br /> Minimum burial depth is subject to local fire marshal regulations. <br /> It is necessary to consider.state and local regulations as well as customer's <br /> specifications prior to installation. <br /> A typical three product service station layout <br /> incorporating Stage I and Stage ll vapor <br /> recovery.Ameron recommends the use of <br /> flexible connectors at dispensers and tanks. <br /> Alternatively,a 4-R"dogleg"is allowable <br /> per API Specification 1615.System <br /> components are not shown to scale. O 0 <br /> Vapor return lines should maintain a constant <br /> slope from dispenser to tank.Although not <br /> shown in this drawing,vapor and product lines <br /> are typically situated at the same subgrade <br /> elevation.Crossovers should be made as shown <br /> in the photograph on page 12. 0 <br /> Concrete <br /> Asphalt <br /> Approved fill <br /> 77777�77- <br /> Legend: Product Vapor <br /> C X <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.