My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 2:10:05 PM
Creation date
6/23/2020 6:42:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POMECO Multi-Port Spill Container Manhole 3. Remove the cover and measure the distance <br /> Installation Instructions from the top of the tanks to the final grade. <br /> 1. Mark off finish grade. (See Figure 1.) 4. Cut the riser(s)from the underground tank so <br /> that both the fill and vapor risers are set below <br /> Finish Grade the final grade. Use the dimensions below: <br /> Spill Container Inches below grade(L) <br /> 5 Gal.Cast Iron Base . 181/20 <br /> 5 Gal.Composite Base 195/81, <br /> Figure 1 7.5 Gal.Cast Iron Base 22Y2* <br /> 7.5 Gal.Composite Base 23 5/8" <br /> 'Note., Add an extra 3-114"when usfng an OPW <br /> 2. Set multi-port manhole assembly(skirt,ring,and FSA-400 Face Seal Adapts: (See fture 2.) <br /> cover}to the final grade position. (See Figure (Offset add extra 6") <br /> 2•) 5. Debun'and thoroughly dean riser pipe(s). <br /> Finish Grade 6. Apply pipe dope to riser(s). The pipe dope is.to <br /> be a non-hardening,gasoline resistant, pipe <br /> thread seal compound. <br /> 7. Install OPW FSA-400 Face Seal Adapter onto <br /> user. (Recommend Torque,4"NPT, 125 ft4bs <br /> min.to 250 ft4bs max.). Apply pipe dope to <br /> FSA-400. The pipe dope is to be a non- <br /> hardening,gasoline resistant, pipe thread seal <br /> compound. This is optional for spill containers <br /> that are on the vapor lines. <br /> 8. Thread on spill containers <br /> 9. Using the 61 SA TOOL,tighten the spin <br /> container(s)onto the riser(s)with a minimum <br /> Figure 2 torque of 125 it.-lbs.and a maximum torque of <br /> 250 itAbs. <br /> Note: it is strongly recommended that POMECO Note: Do NOT attempt to completely tighten the <br /> covers be installed with the following minimum containment bucket by using the containment <br /> clearances. Sheet metal skirts should have bucket mounting ring at the top of the bucket. <br /> adequate clearance between the tank sump riser 10. Inspect the containment bucket O-Rings and <br /> sidewali and or the sump top hat. A minimum of Mounting Ring 0-Rings;for damage. Replace <br /> one and a half inches clearance on all sides is the gasket(s)if they are damaged. <br /> recommended between the POMECO skirt and 11. Install Optional Multi-Port Water Shroud <br /> the tank sump wall or the sump top hat wail. A (MPWS).See separate instructions. <br /> minimum of two inches clearance is 12. Remove Spill Container Cover and Sp11 <br /> recommended between the bottom of the Container Mounting ring from Manhole Cover. <br /> POMECO skirt and the horizontal surface of the 13. Replace the multi-port cover,centering the <br /> tank sump or sump top hat These clearances riser(s)as dose as possible in the containment <br /> are recommended to allow adequate water openings. Be very careful not to move or <br /> migration away from the sumps. Great care damage the 0-Rings. <br /> should be used to maintain the recommended 14. Remove lock washers and nuts from the <br /> clearances when setting the rings and pouring studded mounting ring. <br /> the concrete. (See Figure 3.) <br /> 1%s Min <br /> N <br /> Figure 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.