Laserfiche WebLink
exists. To determine•where the leak is,look for a <br /> steady stream of bubbles coming from one.of the <br /> .Operation and Maintenance: joins or water leaking on the outside of the bucket. <br /> After each fuel delivery,the operator must NOTE:Do not drain the water into-the UST after the <br /> remove any standing fuel from the container. test is complete. Water must be disposed of per <br /> Fuel can be removed by actuating the dram local requirements for hazardous waste. If the leak <br /> disposable cannot be corrected the spill container should be <br /> valve or with a gasoline absorbing <br /> towel. Annually: Inspect and dean the interior replaced with another: <br /> of the spry container and drain valve screen. POMECO recommends <br /> Remove ac umutated dirt and grit. if the drained <br /> and seals as a rt of the of covers - <br /> valve saeen becomes dogged, remove the maintenance seals re <br /> program. If airy of the seals are _ <br /> valve,soak in water and use high-pressure air to - damage-they should be replace. Only qualified. <br /> dean. Reinstall the drain vat"to its proper position competent.well-trained lechridans should perform. <br /> and test the valve per the appropriate TP2014C maintenance.- <br /> Test <br /> aintenance:Test Procedure. If problems.persist,replace the Note: Common sense and good judgment should <br /> drain vaive.with PM 1DK-21 MFVR(speafted aMcays tie-exercised. The eontradoes <br /> torque 11.5 ft-lbs min to 13.5 Mibs max,5116-18 UN urxferstand'uxh of'al(related site cotlditions prior to : <br /> thread). The sealable cover(I SQ adjustment starting the project is essential. tithe contractor <br /> nut is set at the factory,but due to does.not have a dear understanding of the required <br /> environmental conditions it may be necessary work and site conditions,the contractor Is advised to <br /> to adjust it to.either improve sealing or ease seek dattfication poor to starting any portion of the <br /> cover removal. <br /> Testing Spill Containers <br /> Use TP2014 C or TP201-1 D Test Procedures. Thea <br /> Test Procedures`nn'il check the.seats between the Important:Leave these.instructions with Station <br /> drain valve,nipple and rotatable adapter. To test Operator as per CA126 Requirements <br /> the VA containers base acid beliows:0 the <br /> container with water. A.drop in the water level of <br /> Ill V or greater after one hour means that a leak <br /> SO • <br /> w�CMPA nr <br /> P.O.Box 405003*Cincinnati,Ohio 45240-5003 <br /> l4M 422-2525 Domestically <br /> 513-870-3315 Internationally <br /> Marketing Agent for POMECO by OPW,Inc.. <br /> -Copyright,2002-OPW Fueling Components Inc.,Cincinnati.OH <br /> Printed in U.SA.p1n H15225PA—69103 <br /> 1 ' <br />