My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 4:35:26 PM
Creation date
6/23/2020 6:42:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2016-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> rPipingMaterial: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Manufacturer: 7 Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 170' 17' 10' 180' <br /> Product Stored: Regular 87-Main Regular 87-Siphon Regular 87-Siphon Super 91 <br /> Method and location of Test boots at STP Test boots at STP Test boots at STP Test boot at STP <br /> piping-run isolation: Piping Sumps#1&3 Piping Sumps#1&2 Piping Sumps#2&3 Piping Sump#4 <br /> Wait time between applying *See comments *See comments *See comments 10 Minutes <br /> ressure and starting test: <br /> Test Start Time: 11:35 <br /> Initial Reading(RT): 3 Psi <br /> Test End Time: 12:35 <br /> Final Reading(RF): 3 Psi <br /> Test Duration: 1 Hour <br /> Change in Reading(RF-RI): 0 Psi <br /> Pass/Fail Threshold or <br /> No Loss in Psi <br /> Criteria: <br /> Test Result: Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Secondary Pipe#1,#2 not tested with this testing event. <br /> Note: Checked placement of isolation seal off boot in UDC#1&2 for proper fit and seal. <br /> Applied pressure at Test Boot in STP Piping Sump#4 Super 91. Pressure held with no loss for the 1 hour test period. <br /> { <br /> 9m . <br />
The URL can be used to link to this page
Your browser does not support the video tag.