My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 4:35:26 PM
Creation date
6/23/2020 6:42:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2016-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Sump# 1-87 Sump#2-87 Sump#3-87 Sump#4-91 <br /> Sump Diameter: 48" 48" 48" 48" <br /> Sump Depth: 54" 55" 551/255 55 ''/z" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 13" 25" 13" 13" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 18" 23" 25" 21" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: *See comments *See comments *See comments *See comments <br /> Portion of Sump Tested' *See comments *See comments *See comments *See comments <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes Yes <br /> product and water)?" <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes Yes Yes <br /> shutdown?" <br /> Was fail-safe verified to be No No No No <br /> o erational?` <br /> Wait time between applying water *See comments *See comments *See comments *See comments <br /> and starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(Ii <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: *Not Tested *Not Tested *Not Tested *Not Tested <br /> Was sensor removed for testing? <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Piping Sumps not tested with this testing event. ` <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO"or"Ni the entire sump must be tested. (See SWRCB 11160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.