My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_1986-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 8:38:01 AM
Creation date
6/23/2020 6:42:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1999
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_1986-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QS 39 - Bid Invitation <br />22 Aug 97 <br />page 2of3 <br />14 <br />QUIK STOP MARKETS, INC. <br />P.O. Box 5745, FREMONT, CA 94537 <br />Anyone who has questions about the scope of the work, or who finds <br />discrepancies in, or omissions from, the Contract Documents, is urged to <br />submit a request for interpretation (RFI) to the Architect. <br />Requests for written interpretation received by the Architect thirty-six (36) <br />hours prior to the scheduled closing time for receipt of bids will be <br />responded to. <br />Written addendum will be sent to all interested bidders. <br />Any addenda issued <br />Proposals <br />during the time of bidding shall <br />be a part of <br />the Contract <br />Documents received <br />by the bidder for the preparation <br />of his/her <br />proposal., <br />shall be covered in <br />the proposal and shall be made a <br />part of the <br />ontract: <br />Contract.- <br />Proposals shall be submitted as follows: <br />1. Proposals shall be submitted in a manner that provides the information <br />requested herein and in the contract documents. Incomplete or unclear <br />proposals may be discarded as failure to respond. <br />2. Each proposal must give the full business name and address of the <br />bidder and be signed by an authorized representative, followed by the <br />designation of the person signing. When requested by the Owner, <br />satisfactory evidence of the authority of the signing in behalf of the <br />company shall be furnished. <br />3. Proposals shall include a detailed schedule of construction detailing the <br />major phases required, plus incremental and total durations. <br />4. Proposals must be in writing. Proposals may be submitted by fax which <br />must be followed with a signed hard copy delivered within twenty-four <br />(24) business hours of the bid due date and time. <br />5. Before submitting his/her proposal, each bidder shall carefully examine <br />the Contract Documents; shall visit the site of the Work and inform <br />himself/herself of the conditions and limitations thereby; and shall <br />include in his/her proposal a sum to cover the cost of all items included <br />in the documents as complete systems, including, but not limited to, <br />column handholes as required, column -interior conduits, mounted canopy <br />
The URL can be used to link to this page
Your browser does not support the video tag.