Laserfiche WebLink
V/ 6) x 9 <br />19. Piping (cross sectional diagram, including connections to tank and dispensers). <br />(A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br />_ Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br />Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)3, or <br />(B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade. <br />/ Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(D) v Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) VI/ Underground primary piping will meet all of the following requirements <br />✓ Primary piping in contact with hazardous substance under normalation conditions shall be: <br />op <br />installed inside a secondary containment system in the form of: secondary pipe_Vau[t or <br />/ _lined trench to be sloped to a collection sump at the low point of the piping. <br />y Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />Lined trench used as secondary containment <br />Material compatible with the substance stored. <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />/ and visual alarm system. <br />V/ Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: VAO'OILArSs5 Model: W -'ZOOy <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />V Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />20. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />21. V Plan review and operating permit fees paid. <br />22. VOOO' What is the approximate depth to ground water: 60 1� » <br />(include source of information - borehole logs, monitoring well data, water -- <br />studies, etc.) &% <br />Cru r' C.)o Cj3r j-rj Lj", -S To Gl-00r,301n AI -ea <br />23. t/ Total number of tanks on site after installation: <br />24. ✓ County/City Fire District and Building Department notified. <br />25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owneroro or mus acknowledge this responsibility for workplan submittal by signature and date below. <br />NamesTitle .✓LPc.Tc�✓� knl✓. �Y/iA.��f Date 5 <br />CONDITIONS OF APPROVAL: <br />1 <br />N <br />