My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 8:24:50 AM
Creation date
6/23/2020 6:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRODUCT PIPING SUMP TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: o Pressure O Vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Tank#1 Tank#2 <br /> Tank product Gasoline-91 Gasoline-87 <br /> Sump material FRP FRP <br /> Sump diameter (inches) 48" 48" <br /> Sump depth (inches) 63" 62" <br /> Height from tank top to highest 21" 20" <br /> piping penetration (inches) <br /> Height from tank top to lowest 19" 17" <br /> electrical penetration (inches) <br /> Method of sump attachment to tank Tank Collar Tank Collar <br /> Condition of sump prior to testing Dry Dry <br /> Portion of sump tested Entire Entire <br /> Is system programmed for fail-safe operation? Unknown Unknown <br /> Was fail-safe verified to be operational? No No <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced after testing? Yes Yes <br /> Depth of water level from tank top (inches) 23 23 <br /> Wait time for water level to stabilize (hr:min) 0:14 0:17 <br /> Test start time 8:46 AM 8:46 AM <br /> Initial Probe Reading 2.1377 2.9205 <br /> Test end time 9:01 AM 9:01 AM <br /> Final Probe Reading 2.1376 2.9203 _ <br /> Test duration (hr:min) 0:15 0:15 <br /> Change in water level (t 0.0000 inches) -0.0001 -0.0002 <br /> Pass/Fail threshold (±0.0020 inches/;Hr.) 0.0020 0.0020 <br /> TEST RESULT PASS PASS <br /> Comments: <br /> © 2004 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.