Laserfiche WebLink
D. Results of Testing/Se'r`vicing <br /> Software Version Installed: <br /> Complete the following checklist: <br /> Yes 1 ❑ No* Is the audible alarm operational? <br /> Yes ❑ No* Is the visual alarm operational? <br /> yes ❑ No* Were all sensors visual] inspected,functional] tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at.lowest point of secondary containment and positioned so that I <br /> ill <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is a]] communications equipe-n) <br /> N/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping seent <br /> ❑ N/A monitoring system detects a leak,fails to operate, or is electrically disconnected? If yes: iate <br /> positive shut-down? (Check all that apply) C(Sump/Trench Sensors; 16 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 16 Yes; ❑ No. <br /> 13Yes ElNo* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and o eratinE properly? If so,at what Percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> *No* Is <br /> the manufacturer name and model for all replacement arts in Section E,below. <br /> ❑ Yes* uid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ <br /> ; ❑Water. If es,describe causes in Section E,below. <br /> Yes monitoring system set-UD reviewed to ensure proper settings?Attach set u reports,if a licable <br /> IVOYes onitorin ui mento operational r manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of"s 03/01 <br />