Laserfiche WebLink
. OCT -15-2007 MON 1036 AM QUIJLSTOP MARKETS FAX NO. 51, 571544 <br />WRITTEN PROCEDURES <br />FoRMONITORING <br />1• i 1UNDERGROUND. <br />GE TANK SYSTEMS <br />Quik Stop Market #39 <br />2285 East Fremont Street <br />Stockton, California 95205 <br />The gasoline storage and dispensing system at this location consists of two (2) 12,000 gallon, <br />double-wall fiberglass, <br />brine -filled interstitial, underground storage tanks serving two (2) double - <br />sided blend dispensers (3 product). product lines are double wail fiberglass. <br />A. Each tank, product line, and dispenser pan is monitored continuously by probes within the <br />brine reservoir, turbine sump, and dispenser pan, respectively. <br />8. The Gilbarco EMC 3.1 tank and line monitoring system is manufactured by Veeder- <br />R.00t. Leak conditions trigger visual and audible alarms located in the monitoring system <br />control panel. Turbine shutdown will occur if either power is lost to the control panel or <br />if the turbine sump or dispenser pan probes sense leak conditions. <br />C. The monitor control panel is located in the market storeroom. The monitor is placed in <br />test mode daily to check alarm function. Results are recorded on a "Daily Monitoring <br />System Inspection Log" <br />D. Monitoring is the responsibility of Sital & Kuljit Gall, Franchisees, or their designated <br />duty clerk. Maintenance of the monitoring equipment is the responsibility of Quik Stop <br />Markets, Inc. All repairs will be authorized by Mike Karvelot, Director of Environmental <br />.Affairs. <br />E. If an alarm occurs, the Store Manager will immediately contact the Quik Stop Gasoline <br />Department, which will in turn dispatch a qualified service contractor to the site. The <br />service contractor will determine the cause of alarm and advise Quik Stop of site <br />conditions. If an unauthorized release to secondary containment has occurred, action will <br />be immediately taken to implement the Written Response Plan. <br />F. The monitor panel and probes are checked and certified annually in August. Preventive <br />maintenance and spill bucket testing is scheduled annually in conjunction with monitor <br />certification. SB -989 testing is conducted tri -annually in December ('04, '07, ad infinitum). <br />G. A description of the gasoline system operation and operator's responsibilities are included <br />in the Franchise Agreement. Initial training in operation of the tank system and <br />monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br />Personnel and the Designated UST Operator. <br />