My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_1996-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 11:40:15 AM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2004
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_1996-2004.tif
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 08/05/2003 08:31 1209365 43 TANKNOLOGY PAGE 11/11 <br /> W of <br /> Monitoring System Certification, <br /> Site Address! 1210E. HAMMER LANE Date of Testing/Service: 08/04/2003 <br /> 0 WEST LANE* <br /> P. In—Tank Gauging / d3IR Equipment x❑ Check this box If tank gauging Is used only for inventory control. <br /> ® Check this box if no tank gauging or SM equipment is Installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detactlon monitoring. <br /> Complete the £ollamf,ag checklist_ <br /> Yee IDNo Has all Input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes E]No Were all tank gauging probes visually inspected for damage and residue buildup? <br /> MY ffN Was accuracy of system product level readings tested? <br /> ITYcs MNc Was accuracy of system water level readings tested? <br /> x Yea RN. Were all probes reinstalled properly? <br /> Yep ONe Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected, <br /> Lime Leah Detectors (LLD) t <br /> Check this box if LLDs are not installed. <br /> CotPlets the following cheeklista <br /> El Yee CINo ®N/A requpmeniequipment rti caihn,was leasimulated verify LLD perforance?For <br /> that apply)Simulated exgp pk <br /> x Yee ]Dto Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> M Yee ®No Was the testing apparatus properly calibrated? <br /> My"�y" [:]Nn [:]N/A For mechanical LLD$,does the LLD restrict product flow if it detects a leak? <br /> res a. 0 Nie For electronic LLN,does the turbine automatically shut off if the LLD detects a leak? <br /> Q vee ON- N,, For electronic LL®s,does the turbine automatically shut off if any portion of the monitoring System Is disabled or disconnected? <br /> a Yee EINo xM N/A For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system malfunctions or fails a test? <br /> ElYee �to [D N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yax QNo Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> N. COMMents: <br /> Asge 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.