Laserfiche WebLink
r <br /> Ultramar <br /> Ultramar,Inc. ° 6 ' w_. Telecopy: 209-585-5685 Credit <br /> P.O.Box 466 209-583-3330 Administrative <br /> 525 W.Third Street 209-583-3302 Information Services <br /> Hanford,CA 93232-0466 209-583-3358 Accounting <br /> (209)582-0241 <br /> San Joaquin County <br /> Public Health Services <br /> Environmental Health Division <br /> 304 E. Weber Avenue - 3rd Floor <br /> P.O. Box 388 V/ <br /> Stockton, CA 95201-0388 <br /> Attn: Accounting Office <br /> SUBJECT: Beacon Station#641 <br /> 1210 E. Hammer Lane <br /> Stockton, CA <br /> County Report #5255 <br /> In reviewing the billing for the above referenced project, I have noted that the final billing <br /> amount (including all previously paid invoices) of$4,274.00 is double that of any other <br /> County that I have worked with in California. In order to justify paying the remaining <br /> $1,911.00 of the billing, I will need to see a further breakdown of the cost. A more <br /> detailed breakdown should differentiate the time and dates spent processing the permits <br /> from time spent on the job site performing inspection duties. <br /> I hope to resolve this issue as soon as possible. Attached is a copy of the above <br /> referenced invoice. <br /> If you should have any questions, please contact me at(209) 583-3318. <br /> Very truly yours, <br /> ULTRAMAR INC. <br /> John kar <br /> Project Engineer <br /> JK/mas <br /> BEACON <br /> A Member of the Ultramar Group of Companies #1 Quality and Service <br /> ILIIIT8f11e'� <br />