My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 3:02:45 PM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2011-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ® Pressure ❑ vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges <br />Equipment Resolution: 0.5% of span <br />_. ,.. ;�' ,fi, `m" <br />.. <br />.; Piping Run #fi 87 <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Piping Diameter: <br />3" <br />Length of Piping Run: <br />150, <br />Product Stored: <br />Gasoline <br />Method and location of <br />piping -run isolation: <br />Reducer boots/fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />10 minutes <br />startin test: <br />Test Start Time: <br />12:00 pm <br />Initial Reading (Ri): <br />5 psi <br />Test End Time: <br />1:00 pm <br />Final Reading (RF): <br />5 psi <br />Test Duration: <br />1 hour <br />Change in Reading (RF -RT): <br />None <br />Pass/Fail Threshold or <br />No detectable loss <br />Criteria: <br />Test Result: <br />rx1 Pass Fail <br />Comments -- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Repaired Piping to 87 Line <br />
The URL can be used to link to this page
Your browser does not support the video tag.