My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 3:02:45 PM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2011-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer N Industry Standard ❑ Professional Engineer' <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum N Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />4s ,W <br />UDC # 5/6 <br />UDC Manufacturer: <br />Bravo <br />UDC Material: <br />Steel <br />UDC Depth: <br />9" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />0 <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />0 <br />Condition of UDC prior to <br />testing: <br />Good <br />Portion of UDC Tested <br />2" above piping <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?` <br />❑ Yes ❑ No N NA <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail- <br />safe shutdown?* <br />❑ Yes ❑ No N NA <br />` <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No N NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />30 minutes <br />Test Start Time: <br />1:21 pin <br />Initial Reading (RI): <br />3.0509 <br />Test End Time: <br />1:36 pm <br />Final Reading (RF): <br />3.0496 <br />Test Duration: <br />15 min. <br />Change in Reading (RF -RI): <br />-0.0013 <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />Test Result: <br />O Pass Fail <br />Was sensor removed for testing? <br />❑ Yes O No N NA <br />Was sensor properly replaced and <br />verified functional after testing <br />❑ Yes ❑ No N NA <br />Comments — (include information on repairs made prior to testing, and recominended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />Repaired Piping to 87 Line in UDC 5/6 <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.