Laserfiche WebLink
c:; <br />5. Secondary Pipe Testing <br />Test Method Developed By: ❑ Tank Manufacturer <br />Test Method Used: Pressure <br />Test Equipment Used: Nitrogen/Gauges <br />FX1 Industry Standard EJ Professional Engineer <br />El vacuum 0 Hydrostatic <br />Equipment Resolution: <br />Comments: <br />3 of 7 <br />Piping Run #87 <br />Piping Run# 89 <br />Piping Run # 91 <br />Piping Run # <br />Piping Material: <br />fiberglass <br />fiberglass <br />fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3"/2" <br />3"/2" <br />3"/2" <br />Length of Piping Run: <br />140' <br />150, <br />160' <br />Product Stored: <br />Unleaded 87 <br />Unleaded 89 <br />Unleaded 91 <br />Method and location of piping -run <br />isolation: <br />Pressurized at turbine Pressurized at -tu--rb—ine <br />Pressurized at turbine <br />Wait time: <br />sump sump <br />15 min 15 min <br />sump <br />15 min <br />Test Start Time: <br />Initial Reading (psi): <br />1:15 1:15 <br />1 5 5 <br />1:15 <br />j 5 <br />Test End Time: <br />Final Reading (psi): <br />2:15 1 2:15 <br />5 5 <br />2:15 <br />5 <br />Test Duration (hh:mm)1 <br />hr 1 hr <br />1 hr <br />Change in Reading (psi): <br />0.0 0.0 <br />0.0 f <br />0.0 <br />Pass/Fail Threshold or Criteria: <br />0 0 <br />RA P ,Fail <br />0 <br />0 <br />Comments: <br />3 of 7 <br />