My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 3:02:45 PM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2011-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />5. Secondary Pipe Testing <br />Test Method Developed By: ❑ Tank Manufacturer 0 Industry Standard n Professional Engineer <br />Test Method Used: Pressure El vacuum 0 Hydrostatic <br />Test Equipment Used: Nitrogen/Gauges Equipment Resolution: <br />Piping Run #87 Piping Run # Piping Run # Piping Run 9 <br />Piping -Material: fiberglass <br />Piping Manufacturer: Smith <br />Piping Diameter: 3"12" <br />Length of Piping Run: 140' <br />Product Stared: <br />Unleaded 87 <br />Method and location of piping -run <br />u""" <br />Pressurized at turbine <br />isolation: <br />sump <br />It time: <br />15 min <br />Change in Reading (psi): 0.0 <br />Test Start Time: <br />9:15 <br />Initial Reading (psi): <br />5 <br />Test End Time; <br />11015 <br />Final Reading (psi): <br />Test Duration (hh:mm) I hr <br />I hr <br />I hr <br />Change in Reading (psi): 0.0 <br />0.00.0 <br />0.0 <br />— ------ <br />Pass/Fail Threshold or Crite 0 <br />0 <br />0 <br />Test Result: *Pass, 0 Fail <br />.. ... ..... . <br />. . ........ <br />Comments: This is a post 6 -month follow up test for a repair done on the 87 primary In June. <br />3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.