My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2005-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 2:54:41 PM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2010
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2005-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />Garrett Backus [EH] <br />From: Coen, Nancy [Nancy.Coen@valero.com] <br />Sent: Tuesday, May 05, 2009 7:44 AAA <br />To: Garrett Backus [EH] <br />Subject: RE: 1210 Hammer Lane, Stockton <br />Hi Garrett, <br />A annual line & leak detector test is performed at all Valero locations. This site's annual due date is <br />7/15/09. <br />Nancy Coen <br />Valero Retail Holdings <br />Retail Compliance Dept. <br />Ph. 303-373-6044 <br />Fax: 303-373-1854 <br />Cell: 303-882-9758 <br />From: Huff, Sandy <br />Sent: Tuesday, May 05, 2009 8:34 AM <br />To: Coen, Nancy <br />Subject: FW: 1210 Hammer Lane, Stockton <br />From: Garrett Backus [EH] [mailto:gbackus@sjcehd.com] <br />Sent: Monday, May 04, 2009 3:28 PM <br />To: Huff, Sandy <br />Subject: 1210 Hammer Lane, Stockton <br />Hi Sandy, <br />Alpha Petroleum and I did the cold start inspection for the EVR upgrade today. The ISD portion will be done at a <br />latter date and under a different permit. We tested the liquid sensors and overfill prevention tank gauge only. The <br />outside audio/visual alarm did not work when initially tested but the tech fixed the wiring and the alarm tested OK. <br />The site was not programmed to shut down the turbines when the liquid sensors were in alarm. If you would like <br />to keep the facility set up this way then an annual primary piping line test is required. Typically, the line test is <br />done during the monitoring system certification testing. The annual monitoring system certification will be done in <br />July as we discussed by phone a few weeks ago. <br />Garrett Backus, RENS <br />San Joaquin County Environmental Health Department <br />600 E. Main Street <br />Stockton, CA 95202 <br />telephone: (209) 468-2986 <br />fax: (209) 468-3433 <br />email: gbackus@sjcehd.com <br />5/5/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.