My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:03:59 PM
Creation date
6/23/2020 6:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page 2. <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: El <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: <br />❑ <br />Spill Bucket Manufacturer ❑X <br />Industry Standard <br />Professional Engineer <br />Other (Spec) <br />Test Method Used: <br />❑ <br />Pressure F-1 <br />Vacuum <br />a Hydrostatic <br />El <br />Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # 8 7 Spill Box # 87 <br />Spill Box # <br />89 Spill Box # 89 <br />Bucket Diameter: <br />14 14 <br />14 <br />14 <br />Bucket Depth: <br />12 12 <br />12 <br />12 <br />Wait time between applying <br />pressure/vacuum/water and <br />3 0 3 0 <br />3 0 <br />3 0 <br />starting test: <br />Test Start Time: <br />0930 0930 <br />0930 <br />0930 <br />Initial Reading (RI ): <br />8 8 <br />8.5 <br />9 <br />Test End Time: <br />1030 1030 <br />1030 <br />1030 <br />Final Reading (RF ): <br />8 8 <br />8.5 <br />9 <br />Test Duration: <br />1 hr 1 hr <br />1 hr <br />1 hr <br />Reading (R F- RI) <br />0 0 <br />0 <br />0 <br />hreshold or <br />I <br />0 0 <br />0 <br />0 <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.