Laserfiche WebLink
SWRCB, January 2002 <br />Page 3. <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: El <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: <br />❑ <br />Spill Bucket Manufacturer ❑X <br />Industry Standard ❑ Professional Engineer <br />Other (Spec) <br />Test Method Used: <br />❑ <br />Pressure F-1 <br />Vacuum a Hydrostatic <br />❑ <br />Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # 91 Spill Box # 91 <br />momemonsomommmm <br />Spill Box # dsl Spill Box # <br />Bucket Diameter: <br />14 14 <br />14 <br />Bucket Depth: <br />12 12 <br />12 <br />Wait time between applying <br />pressure/vacuum/water and <br />3 0 30 <br />30 <br />starting test: <br />Test Start Time: <br />0930 0930 <br />0930 <br />Initial Reading (RI ): <br />8 8 <br />9 <br />Test End Time: <br />1030 1030 <br />1030 <br />Final Reading (RF ): <br />8 8 <br />9 <br />Test Duration: <br />lhr lhr <br />1 hr <br />Change in Reading (R F - RI) <br />0 0 <br />0 <br />Pass/Fail Threshold or <br />0 0 <br />0 <br />Criteria: <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />