My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Results of Testing/Servicing <br /> Software Version Installed: 329.01 <br /> e <br /> Com fete the following checklist: <br /> ® Yes ❑No* Is the audible alarm operational? <br /> ®Yes ❑No* Is the visual alarm operational? <br /> ® Yes ❑No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> ® Yes ❑No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ®N/A operational? <br /> For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ® Yes ❑No* monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> ❑N/A positive shut down? (Check all that apply) ® Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut down due to leaks and sensor failure/disconnection? ® Yes; ❑No. <br /> ❑No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑Yes ®N/A mechanical overfill prevention valve is installed), is the over-fill warning alarm visible and audible at the tank <br /> fill point(s)and operating ro erl ? If yes,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* ®No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ®No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below. <br /> ®Yes ❑No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> ® Yes ❑ No* I Is all monitoring equipment oerational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 <br /> Monitoring System Certification <br />
The URL can be used to link to this page
Your browser does not support the video tag.