Laserfiche WebLink
` <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— (Page 1 of 2) <br /> IYPE OF ACTION ❑ 1 NEW PLAN [g 2 CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1 MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY 490-2. <br /> (Check one item only) ❑ 2 THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> 1 FACILITY INFORIVIATIQN„ <br /> FACILITY ID#(Agency Use Only) ITTT <br /> BUSINESS NAME�as a�ry Name or D�� 3 <br /> BUSINESS SITE DRESS (,,�(,,i 103 CIT toa <br /> � t � -b q d <br /> . � M� T�'ESTIN ANDSPI2F'VIi TI T0- x <br /> y <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> the eq!j!n nt manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed�y qualifiedpersonnel. gR§z63z,263°,2638,26411 <br /> MONITORING EQUIPMENT IS SERVICED y�14Wia <br /> �.ANNUALLY i ❑*99.OTHER(Specify): 490-3b. <br /> ❑ I NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SIIE PLOT PLAN/MAP PREVIOUSLY SUBMITTED490-4 <br /> [23 CCR§2632,2634] <br /> 1 CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5 <br /> WITH AUDIBLE AND VISUAL ALARMS (23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: C9 a DRY ❑ b LIQUID FILLED ❑ c.PRESSURIZED ❑ d UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: 490.7 MODEL#: 71—S :3157) 490-8 <br /> _ LEAK SENSOR M_ANUFACIURER: 490-9 MODEL#(S):..r0.90-10 <br /> ❑ 2 AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) [23 CCR§26431 490-11 <br /> PANEL MANUFACTURER: 490-12 MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14 MODEL#(S): 490.15 <br /> LEAK TEST FREQUENCY: ❑ a CONTINUOUS ❑ b.DAILY/NIGHILY ❑ c WEEKLY 490-16 <br /> ❑ d,MONTHLY ❑ e OTHER(Specify): 490-17 <br /> PROGRAMMED TESTS: C1 �: <br /> a.0 1 h ❑ b.0.2 h. ❑ c.OTHERS i 4997 <br /> 0-18 <br /> _._.._._... -P',-ECO N_­C_1L__1A' _T'1 <br /> �Q�.fY)�.. .ago-19--- <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.q 490-20 <br /> .—._-----.____—..-----------.._...._____._ _.._------------------`—•------.......__.__...__...___._..----..._...._._..._.____...._.- 90- _-._. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING TG [23 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.,,600.90- <br /> HOURS °9x21 <br /> ❑ <br /> -5-.-TANK INTEGRITY TESTING PER[23 CCR§264311 490-23 <br /> IESTFREQUENCY: ❑ a ANNUALLY ❑ b.BIENNIALLY Elc.c.OIHER(Specify�. 4W25.__,_ <br /> ❑.99.OTHER Secify): - --- - - 490-26 <br /> 490.27. <br /> y <br /> :'ria "' - ""� 2 §xa 4 �A ",� • <br /> I CONTINUOUS MONITORING OF PIPEIPIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS 490-28. <br /> [§26361 SECONDARY CONTAINMENT IS: 9 a DRY El b.LIQUID FILLED ❑ c PRESSURIZED El d.UNDER VACUUM 0.90-29 <br /> PANEL MANUFACTURER: QX 490-30 MODEL#: T(, 490-31 <br /> LEAK SENSOR MANUFACTURER: 490-32 MODEL#(S): a0g 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e,TURBINE)SHUTDOWN. ❑ a.YES ❑ b NO 490'34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-31. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3 0 g p h LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED [23 CCR§26361 <br /> _M_LLD MANUFA_CTU_RE S);_ 490-37 MODEL#(S)_ 490-39. <br /> ❑ 3 ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUIINELY PERFORMS 3 0 g p h LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 490.40 MODEL#(S): 490-41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a MINIMUM MONTHLY 0 2 g p h ❑ b MINIMUM ANNUAL 0.1 g p h. 490.42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑ b NO 490-41 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44 <br /> ❑ 4 PiPEINTEGRTTYTESTING. •- <br /> 490-45 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(S ci 490.46 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY: ❑ a DAILY ❑ b WEEKLY ❑ c MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> ---- _ ------__--- _._ _ .`_-Allowed for monioodn�of unburied amergenyy.�enaatot fuel ppingo"�mer HSC 2§5281.5(b�.,.... <br /> ❑ 6.-__SUCTION_____--- <br /> PIPING------ME—_—EIS---EXEMPTION—_— CRITERIA.(z3 ccR§2636[a1[3)1 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490"51. <br /> ❑ 99.OTHER(S eci ) 490sz <br /> 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />