<br /> UPCF UST Monitoring Plan —Page 1 Instructions
<br /> Complete a separate UST Monitoring Plan for each UST monitoring system at the facility. This form must be submitted with your initial UST
<br /> Operating Permit Application and within 30 days of changes in the information it contains. Your local agency may require you to obtain approval
<br /> prior to installing or modifying monitoring equipment.. (Note: Numbering of these instructions follows the data element numbers on the form..)
<br /> 490-1 TYPE OF ACTION—Check the appropriate box to indicate why this plan is being submitted.
<br /> 490-2 PLAN TYPE—Check the appropriate box to indicate whether this plan covers all,or merely some,of the USTs at the facility If the plan covers only some of
<br /> the tanks,identify those tanks in the space provided[e g,by using the Tank ID#(s)in item 432 of the USTOperating Permit Application—Tank Information
<br /> Form(s)J.
<br /> 1, FACILITY ID NUMBER—This space is for agency use only.
<br /> 3. BUSINESS NAME—Enter the complete Facility Name
<br /> 103 BUSINESS SITE ADDRESS—Enter the street address where the facility is located,including building number,if applicable.Post office box numbers are not
<br /> acceptable. This information must provide a means to locate the facility geographically.
<br /> 104. CIIY—Enter the city or unincorporated area in which the facility is located
<br /> 490-3a. MONITORING EQUIPMENT IS SERVICED—Check the appropriate box to specify the frequency of monitoring equipment testinglcertification
<br /> 490-3b Specify Other frequency for monitoring equipment servicing.
<br /> 490-4 SITE PLAN—Indicate if a site plan/map is submitted with this monitoring plan or if it was submitted previously and is current for the facility Monitoring
<br /> plans must include a Site Plot Plan/Map showing the tank and piping layouts and the locations where monitoring is performed(i e, location of sensors,
<br /> probes,line leak detectors,monitoring system control panel,etc)
<br /> 490-5. IV-I CONTINUOUS ELECTRONIC MONITORING—Indicate if this monitoring method is being used to monitor the tanks
<br /> 490-6 SECONDARY CONTAINMENT—If IV-1 is checked,check the appropriate box to describe the environment inside the tank secondary containment.
<br /> 490-7 PANEL MANUFACTURER—If IV-1 is checked,enter the name of the manufacturer of the monitoring system control panel(console)
<br /> 490-8 MODEL#—If'IV-1 is checked,enter the model number for the monitoring system control panel
<br /> 490-9 LEAK SENSOR MANUFACTURER—If IV-I is checked,enter the name of the manufacturer of the sensor(s) If additional space is needed,use Section X.
<br /> 490-10 MODEL#(S)—If IV-1 is checked,enter the model number for each type of sensor installed.If additional space is needed,use Section X
<br /> 490-11 IV-2 AUTOMATIC TANK GAUGING-Indicate if this method is used for monitoring the UST's.
<br /> 490-12 PANEL MANUFACTURER—If IV-2 is checked,enter the name of the manufacturer of the monitoring system control panel(console).
<br /> 490-13 MODEL# If IV-2 is checked,enter the model number for the monitoring system control panel
<br /> 490-14 IN-TANK PROBE MANUFACTURER—If IV-2 is checked,enter the name of the manufacturer of the probe(s)
<br /> 490-15 MODEL#(S)—If IV-2 is checked,enter the model number for each type of in-tank probe installed.If additional space is needed,use Section X
<br /> 490-16 LEAK TEST FREQUENCY—If IV-2 is checked,check the appropriate box to describe the in-tank leak test frequency
<br /> 490-17. SPECIFY—If 490-16e is checked,enter the frequency of programmed leak tests.
<br /> 490-18. PROGRAMMED TESTS—If IV-2 is checked,check the appropriate box to describe the tests programmed into the ATG system
<br /> 490-19 SPECIFY—If 490-18c is checked,enter the frequency of in-tank leak testing,
<br /> 490-20 IV-3 INVENTORY RECONCILIATION—Check the box if'statistical inventory reconciliation is performed
<br /> 490-21. IV•4 WEEKLY MANUAL IANK GAUGING Indicate if this method is used to monitor the tanks
<br /> 490-22 TESTING PERIOD—If'IV-4 is checked,check the appropriate box to describe the MIG testing period
<br /> 490-23 IV-5 TANK INTEGRITY TESTING:Indicate if this method is used to monitor,the tanks..
<br /> 490-24. TEST FREQUENCY—If IV-5 is checked,check the appropriate box to describe the frequency of tank integrity testing
<br /> 490-25. OTHER If 490-24c is checked,specify other test frequency.
<br /> 490-26. TV-99 OTHER:Indicate if monitoring of the tanks occurs that is not indicated in any other category
<br /> 490-27 If IV-99 is checked,enter a brief'description of the other tank monitoring method(s)used(e g.,vadose zone monitoring per 23 CCR§2647,groundwater
<br /> monitoring per 23CCR§2648) Include the monitoring frequency(e g,Continuous,Weekly). If additional space is needed,use Section X
<br /> 490-28 V-1 CONTINUOUS MONITORING OF PIPEIPIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND VISUAL
<br /> ALARMS:Indicate if this is the monitoring method used for the piping.
<br /> 490-29. SECONDARY CONTAINMENT:If V-1 is checked,Check the appropriate box to describe the environment inside piping secondary containment
<br /> 490-30. PANEL MANUFACIURER—If V-I is checked,enter the name of the manufacturer of the monitoring system control panel(console)
<br /> 490-31 MODEL#—If V-1 is checked,enter the model number for the monitoring system control panel
<br /> 490-32 LEAK SENSOR MANUFACTURER—If V-1 is checked,enter the name of the manufacturer of the sensor(s)
<br /> 490-33 MODEL#(S)—If V-1 is checked,enter the model number for each type of sensor installed If additional space is needed,use Section X
<br /> 490-34. PIPING LEAK ALARM T RIGGERS AUTOMATIC PUMP SHUIDOWN —If V-1 is checked,check Yes or No
<br /> 490-35 FAILURE/DISCONNECTION OF THE MONIIORING SYSTEM IRIGGERS AUTOMATIC PUMP SHUTDOWN-If V-1 is checked,check Yes or No
<br /> 490-36. V-2 PIPE MECHANICAL LINE LEAK DETECTORS PERFORM 3 GPH LEAK TESTS:Indicate if this monitoring method is used to monitor the pipelines
<br /> 490-37 MLLD MANUFACTURERS)—If'V-2 is checked,enter the name(s)of the manufacturers)of the mechanical line leak detector(s) If additional space is
<br /> needed,use Section X
<br /> 490-38 MODEL#(s)—If V-2 is checked,Enter the model number for each type of mechanical line leak detector installed U additional space is needed,use Section
<br /> X
<br /> 490-39 V-3 PIPE ELECTRONIC LINE LEAK DETECTORS:Indicate if this monitoring method is used to monitor the pipelines
<br /> 490-40 ELLD MANUFACTURER—If'V-3 is checked,Enter the name of the manufacturer of the electronic line leak detector(s)
<br /> 490-41 MODEL#(S)—If V-3 is checked,enter the model number for each type of electronic line leak detector installed If additional space is needed,use Section X.
<br /> 490-42. PROGRAMMED LINE INTEGRITY TESTS—If V-3 is checked,check the appropriate box to describe the type of tests programmed into the monitoring
<br /> system.
<br /> 490-43. ELLD DETECTION OF A PIPING LEAK ALARM TRIGGERS PUMP SHUTDOWN—If V-1 is checked,check Yes or No
<br /> 490-44 ELLD DETECTION OF A PIPING LEAK FAILURE/DISCONNECTION TRIGGERS PUMP SHUTDOWN—If V-I is checked,check Yes or No.
<br /> 490-45 V-4 PIPE INTEGRITY TESTING—Indicate if this monitoring method is used to monitor the pipelines
<br /> 490-46. TESL FREQUENCY—If'V-4 is checked,check the appropriate box to describe the frequency of pipe integrity testing.
<br /> 490-47 SPECIFY—If 490-46-99 is checked,enter the frequency of pipe integrity testing..
<br /> 490-48. V-5 VISUAL PIPE MONITORING—Indicate if this monitoring method is used to monitor the pipelines.
<br /> 490-49 If V-5 is checked,check the appropriate box to describe the frequency of visual monitoring
<br /> 490-50. SUCTION PIPING MEETS EXEMPTION CRITERIA- Indicate if this monitoring method is used to monitor the pipelines.
<br /> 490-51 NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION M,CHAPTER 6 7 IS CONNECTED TO THE TANK SYSTEM- Check
<br /> this box if no piping in the tank system is regulated under the UST law,or there is no piping
<br /> 490-52 V-99 OTHER—Indicate if another method is used for pipeline monitoring.
<br /> 490-53 SPECIFY—Enter a brief description of the other line monitoring method(s)used. If additional space is needed,see Section X Be sure to clearly describe
<br /> monitoring method(s)and frequency
<br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e,location of'each
<br /> sensor,line leak detector,monitoring system control panel,etc). If you already have a diagram(e g,current UST Monitoring Site Plan from a Monitoring System
<br /> Certification form,Hazardous Materials Business Plan map,etc)that shows all required information,include it with this plan.
<br /> UPCF UST-D(12/2007)-2/4 www.unidocs org