Laserfiche WebLink
E <br />Monitoring System Certification <br />!1I <br />Software Version Installed: 329.01 <br />Complete the following checklist: <br />0 WO -8286 <br />El Yes <br />[]No* <br />Is the audible alarm operational? <br />[a Yes <br />ONo* <br />Is the visual alarm operational? <br />0Yes <br />E]No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Yes <br />[]No* <br />Was sensor installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />El Yes <br />ONo* <br />If alarms arc relayed to a remote monitoring station, is all communications equipment (e.g., modern) <br />[RIN/A <br />operational') <br />E]Yes <br />ONo* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />ON/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that appty) 0 Sump/Trench Sensors; El Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? OYes; ONo. <br />E]Yes <br />ONo* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br />ON/A <br />mechanical overfill prevention valve is installed), is the overfill warning alaim visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger' % <br />E]Yes* <br />E]No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />El Yes* <br />0No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />OProduct; 0 Water. If yes, describe causes in Section E, below. <br />E]YIS <br />ONo* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />I <br />ElYes <br />[]No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />I <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />#7 M rom M sm- M I <br />MIR <br />for proper di sposal. <br />Only tested the Ii Diesel Annular Sensor after replacement. <br />Page 2 of 3 <br />