Laserfiche WebLink
E <br />Monitoring System Certifleation <br />F. In -Tank Gauging / SIR Equipment: <br />11 <br />0 Check this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />0 Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />OYcs <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />[3 Yes <br />[]No* <br />Were all items on the equipment manufacturer's maintenance checklist completed'? <br />* in the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Com tete the follo ing checklist: <br />E] Check this box if LLDs are not installed. <br />❑ Yes <br />ONo* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />ON/A <br />(Check all that apply) Simulated leak rate: 0 3 g.p.h.; C-] 0.1 g,p.h ; 0 0.2 g.p.h. <br />❑ Yes <br />E]No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />0 Yes <br />ONo* <br />Was the testing apparatus properly calibrated? <br />OYcs <br />ONo* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />ON/A <br />[:]Yes <br />[]No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak'? <br />EIN/A <br />OYes <br />ElNo* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />ON/A <br />or disconnected? <br />El Yes <br />[]No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />ON/A <br />or fails a test? <br />s <br />ONo* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />LY <br />ONIA <br />oyes <br />[]No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Page 3 of 3 <br />