Laserfiche WebLink
Site Address: 642 N HUNTER <br />D. Results of Testing/Servicing <br />Software Version Installed: 121.00 <br />Complete the following checklist: <br />aitoring System Certification 0 <br />Date of Testing/Service: 10/07/2004 <br />El Yes <br />No * <br />Is the audible alarm operational? <br />0 Yes <br />❑ No * <br />Is the visual alarm operational? <br />0 Yes <br />Eho * <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />0 Yes <br />❑ No <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br />interfere with their proper operation? <br />El Yes <br />No * <br />N/A <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />® Yes <br />❑ No * <br />❑ N/A <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive <br />shut -down? (check all that apply) ❑X Sump/Trench Sensors; ❑x Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ❑X Yes ❑ No <br />® Yes <br />❑ No * <br />❑ N/A <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanical <br />overfill prevention valve is installed), is the overFll warning alarm visible and audible at the tank fill points(s) and operating <br />properly? If so, at what percent of tank capacity does the alarm trigger? 95 % <br />® Yes* <br />❑ No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E, below. <br />® Yes* <br />® No <br />Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) ❑ Product; <br />El Water. If yes, describe causes in Section E, below. <br />® Yes <br />❑ No * <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set-up reports, if applicable. <br />© Yes <br />❑ No * <br />Is all monitoring equipment operational per manufacturers' specifications? <br />* In Section E below, describe how and when these deficiences were or will be corrected. <br />E. Comments: <br />REPLACED ANNULAR LIQUID SENSOR # 6 (1-6) TANK # 2 REGULAR, WITNESS BY COUNTY INSPECTOR. <br />page 2 of 3 <br />